Region(s)  1st Ad Date* Project Description Contact Email Proposal Due Date
4 1/15/2026 R4 PS US287 Safety Improvements Construction Package 1 & 2 CM, CI & MT (27210/27211)
[email protected]
02/05/2026
SW 1/22/2026 SW Program Specific Low Carbon Transportation Materials Support (LCTM) [email protected] 2/12/2026
2 TBD R2 PS US 50 Safety/Operational Highway Improvements for Freight and Travel (SHIFT) Passing Lanes CM/GC Design (25781) [email protected] TBD
3 TBD R3 PS 050A Cerro Summit Walls Design (27358) [email protected] TBD
1 TBD R1 PS Federal Blvd Bus Rapid Transit Final CM/GC Design & Construction Phase (27327) [email protected] TBD
HQ, 1, 2 & 4 3/2026 Front Range NPS Traffic Engineering Services [email protected] TBD

*All dates are subject to change