You are here: Home Business Center Design & Construction Project Support Materials and Geotechnical Manuals 2023 Field Material Manual 2023 Field Materials Manual as revised to be used on projects advertised between July 1, 2022 and November 10, 2022 Introduction to Documents Introduction to Documents https://www.codot.gov/business/designsupport/materials-and-geotechnical/manuals/2023-field-materials-manual/2023-fmm-pre-nov-10-2022/intro-docs https://www.codot.gov/@@site-logo/siteLogo.png Introduction to Documents Front Cover Introduction Revised on November 11, 2022. FMM & CDOT Materials Forms: Comments and Corrections FMM & CDOT Materials Forms: Comments and Corrections with JotForm Table of Contents Quality Assurance Procedures for Construction and Materials Sampling & Testing Documentation for SiteManager / LIMS – Project Materials to Final Materials ADOBE Sign Log-in Instructions for the CDOT Forms 473/474-21 Documentation for Design-Build Quality Assurance Program – Project Materials to Final Materials Documentation – CDOT Maintenance or Local Agency Revised on September 20, 2022. Special Notice to Contractors Revised on November 11, 2022. OA Frequency Guide Schedule for Minimum Materials Sampling, Testing, and Inspection IA FREQUENCY GUIDE SCHEDULE for Evaluation of OA Sampling & Testing
Introduction to Documents https://www.codot.gov/business/designsupport/materials-and-geotechnical/manuals/2023-field-materials-manual/2023-fmm-pre-nov-10-2022/intro-docs https://www.codot.gov/@@site-logo/siteLogo.png Introduction to Documents Front Cover Introduction Revised on November 11, 2022. FMM & CDOT Materials Forms: Comments and Corrections FMM & CDOT Materials Forms: Comments and Corrections with JotForm Table of Contents Quality Assurance Procedures for Construction and Materials Sampling & Testing Documentation for SiteManager / LIMS – Project Materials to Final Materials ADOBE Sign Log-in Instructions for the CDOT Forms 473/474-21 Documentation for Design-Build Quality Assurance Program – Project Materials to Final Materials Documentation – CDOT Maintenance or Local Agency Revised on September 20, 2022. Special Notice to Contractors Revised on November 11, 2022. OA Frequency Guide Schedule for Minimum Materials Sampling, Testing, and Inspection IA FREQUENCY GUIDE SCHEDULE for Evaluation of OA Sampling & Testing