Library

US 6 Clifton Access Control Plan

Region 3 of the Colorado Department of Transportation (CDOT) and Mesa County have identified a need to improve future traffic operations on US 6 between the I-70 Business Loop and the railroad viaduct east of 33 Road by developing an access management plan (AMP) . This ACP evaluated the portion of the US 6 corridor located from the Interstate 70 (I-70) Business Loop to the viaduct over the Union Pacific Railroad east of 33 Road. Keywords: Studies, US Highways, Access Control Plan
File PDF document US 6 Access Control Plan - Final Report
November 2008
File PDF document Appendix A
Existing Access Locations (Map)
File PDF document Appendix B
Access Control Map
File PDF document Appendix C
Access Control Plan Table
File PDF document Appendix D
Intergovernmental Agreement
File PDF document Appendix E
Mailing List
File Appendix F
Average Daily Traffic Counts
File Appendix G
Peak Hour Turning Movement Counts
File Appendix H
Existing Conditions Level of Service
File PDF document Appendix I
Safety Study
File Appendix J
2035 No Action Level of Service
File PDF document Appendix K
First Open House Summary Report
File PDF document Appendix L
2nd Open House Summary Report
File PDF document Appendix M
Final Open House Summary Report
File Appendix N
2035 Build Level of Service
Contact Information

Alisa Babler, P.E.
Permit Engineer
CDOT, Region 3
222 South 6th Street, Room 100
Grand Junction, CO 81501
[email protected]

Colorado: The Official State Web Portal