Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Archived Project Sites
  4. US 50 East
  5. Documents
  6. reports
Resources
  • Projects
  • Assets
  • Studies
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • I-270 Corridor Improvements
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
  • CO 207 & CO 266 Resurfacing
  • CO 74 Evergreen Lake North Trail
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 21 and US 24 Signal Improvement Project in El Paso County
  • US 50 Passing Lane - Gunnison County
  • CO 72 Ignacio Resurfacing
  • US 50 & CO 71 Intersection Improvements
  • US 385 Holyoke North Resurfacing
  • CO 170 Critical Culverts, Boulder County
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • Southeast Colorado Guardrail Replacement
  • I-25 Surface Treatment MP 59 – MP 64
  • CO 93 Resurfacing between US 6 and 58th Ave
  • I-70 Bridge Maintenance between Limon and Agate
  • CO 64 & CO 13 Meeker Resurfacing
  • CO 64 Bridges west of Meeker
  • CO 114 Overlay, Gunnison to Saguache County
  • Archived Project Sites
    • CO 116 Two Buttes Resurfacing Project
    • US 50 East
      • Project Overview
      • Schedule
      • Previous Study
      • Public Hearings on Tier 1 Draft Environmental Impact Statement
      • FAQ
      • Draft Tier 1 Environmental Impact Statement
      • Combined Final Tier 1 Environmental Impact Statement/Record of Decision
      • Get Involved
      • Documents
        • 12-01-09_construction_info.pdf
        • 2-1-06_press_release.pdf
        • 2nd_yr_env_study_progress.pdf
        • 4-22-09_message_board_installation_on_highway50.pdf
        • 8-31-05_support.pdf
        • 8-8-05_US50_hasty.pdf
        • 8-9-05_US50_fowler.pdf
        • 8-9-05_US50_slab_replacement_lama.pdf
        • acquisition.pdf
        • Bent_21.pdf
        • Bent_22.pdf
        • Bent_23.pdf
        • Bent_24.pdf
        • Bent_25.pdf
        • Bent_26.pdf
        • Bent_27.pdf
        • Bent_28.pdf
        • Bent_29.pdf
        • Bent_29_s.pdf
        • Bent_30.pdf
        • Bent_31.pdf
        • Bent_32_s.pdf
        • Bent_33.pdf
        • bridge_repairs_replacements_032107.pdf
        • business_farms.pdf
        • comment_form_02-21-06.pdf
        • earmarked_funds_071107.pdf
        • ESGuide5-12-05e-book.pdf
        • faq_press_release12_15_06.pdf
        • fowler_ passing _lanes_070108.pdf
        • i-fowler1_h_s_sif_n.pdf
        • i-manzanola3_rr.pdf
        • newsfromcdot9_3_09.pdf
        • newsletter1-30-06s.pdf
        • newsletter_08_web.pdf
        • newsletter_outside_2008_s.pdf
        • newsletterinside_2008_s.pdf
        • oh_2_28_06
        • oh_8-07
        • Otero_11s.pdf
        • Otero_12s.pdf
        • Otero_13s.pdf
        • Otero_14s.pdf
        • Otero_15s.pdf
        • Otero_16s.pdf
        • Otero_17s.pdf
        • Otero_18s.pdf
        • Otero_19s.pdf
        • Otero_20.pdf
        • Otero_Co-1 2.pdf
        • pr_09-12-05.pdf
        • pr_6-28-05.pdf
        • pr_7-18-05.pdf
        • pr_scoping_mtgs _2-14-06_ final.pdf
        • Prowers_34.pdf
        • Prowers_35.pdf
        • Prowers_36.pdf
        • Prowers_37.pdf
        • Prowers_38.pdf
        • Prowers_39.pdf
        • Prowers_40.pdf
        • Prowers_41.pdf
        • Prowers_42.pdf
        • Prowers_43.pdf
        • Prowers_44.pdf
        • Public Hearing Notice
        • Pueblo_1.pdf
        • Pueblo_10s.pdf
        • Pueblo_2.pdf
        • Pueblo_2_s.pdf
        • Pueblo_3.pdf
        • Pueblo_4.pdf
        • Pueblo_5.pdf
        • Pueblo_6.pdf
        • Pueblo_7.pdf
        • Pueblo_8.pdf
        • Pueblo_9.pdf
        • regional view 11x41 2-1-06 s.pdf
        • reports
          • economic_conditions_s.pdf
          • economical_analysis_s.pdf
          • traffic_cond_s.pdf
          • us50corridor_sel_study_s.pdf
          • vision_report_s.pdf
        • residential.pdf
        • row
        • swink-laJunta_1000-1.pdf
        • through_town_typical_section.pdf
        • typical_section_1.pdf
        • US50_8_2007_public_meetings_press_release.pdf
        • us50_process_schedule_web.pdf
        • us50fall2009update9_1_09.pdf
        • Viewing Locations
reports https://www.codot.gov/projects/archived-project-sites/us50e/documents/reports https://www.codot.gov/@@site-logo/siteLogo.png

reports

economic_conditions_s.pdf
economical_analysis_s.pdf
traffic_cond_s.pdf
us50corridor_sel_study_s.pdf
vision_report_s.pdf

Contact Us

303-209-2324
[email protected]

En Español
Para más información cerca de la carretera US 50 Este, por favor llame al 303-209-2324.

Mailing Address
CDOT-US 50 Corridor C/O
7604 Technology Way, Suite 400
Denver, CO 80237

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo