Projects

Alternative A Exhibit 1.1

Project Status: Complete

Preliminary Alternative A from the FEIS, Feasibility Alternative 1B from the US 160 FEIS, additional design variations along the existing US 550 alignment (the "T" Series).

PDF document icon Alt A Exhibit 1-1r.pdf — PDF document, 2.27 MB (2377091 bytes)

Project Contact:

Lisa Schwantes
CDOT Communications Manager
Region 5
970-385-1428
[email protected]

Colorado: The Official State Web Portal