You are here: Home Projects CO 83 (Parker Road) Sidewalk East Side Photo Gallery Photo Gallery https://www.codot.gov/projects/co83parkerrdsidewalk/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Parker Rd.- Looking South at Hilltop Rd. where the missing trail segment will be installed down south past Parker Square Rd .JPG Parker Rd.- Looking S. at Sulphur Gulch, where the pedestrian bridge and mising trail segment connection will be installed.JPG Parker Rd.- Looking North towards Parker Square Rd. where the missing trail segment will be installed to Hilltop Rd. .JPG Parker Rd.- Looking North towards Clubhouse drive, where the missing trail segment will be installed up and over Sulphur Gulch.JPG Retaining wall construction is currently underway between E Parker Square Drive and Hilltop Road to make way for the new sidewalk. Crews building a retaining wall between E Parker Square Drive and Hilltop Road and prepping for sidewalk construction. Site preparation near the Sulphur Gulch bridge includes material dumping for crane pad creation and structural elements for the pedestrian bridge.
Photo Gallery https://www.codot.gov/projects/co83parkerrdsidewalk/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Parker Rd.- Looking South at Hilltop Rd. where the missing trail segment will be installed down south past Parker Square Rd .JPG Parker Rd.- Looking S. at Sulphur Gulch, where the pedestrian bridge and mising trail segment connection will be installed.JPG Parker Rd.- Looking North towards Parker Square Rd. where the missing trail segment will be installed to Hilltop Rd. .JPG Parker Rd.- Looking North towards Clubhouse drive, where the missing trail segment will be installed up and over Sulphur Gulch.JPG Retaining wall construction is currently underway between E Parker Square Drive and Hilltop Road to make way for the new sidewalk. Crews building a retaining wall between E Parker Square Drive and Hilltop Road and prepping for sidewalk construction. Site preparation near the Sulphur Gulch bridge includes material dumping for crane pad creation and structural elements for the pedestrian bridge.
Parker Rd.- Looking South at Hilltop Rd. where the missing trail segment will be installed down south past Parker Square Rd .JPG
Parker Rd.- Looking S. at Sulphur Gulch, where the pedestrian bridge and mising trail segment connection will be installed.JPG
Parker Rd.- Looking North towards Parker Square Rd. where the missing trail segment will be installed to Hilltop Rd. .JPG
Parker Rd.- Looking North towards Clubhouse drive, where the missing trail segment will be installed up and over Sulphur Gulch.JPG
Retaining wall construction is currently underway between E Parker Square Drive and Hilltop Road to make way for the new sidewalk.
Crews building a retaining wall between E Parker Square Drive and Hilltop Road and prepping for sidewalk construction.
Site preparation near the Sulphur Gulch bridge includes material dumping for crane pad creation and structural elements for the pedestrian bridge.