Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. Completed Studies
  5. US 24 West
  6. Documents
  7. August 24, 2006 Open House
  8. Questions and Answers
Resources
  • Projects
  • Assets
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
    • CO 119 Multi-modal Planning and Environmental Linkages Study
    • Completed Studies
      • CO 392 Environmental Overview Study (EOS)
      • US 24 West
        • Schedule
        • Decision Making Process
        • Get Involved
        • Resources
        • Press Room
        • Environmental Assessment
        • Finding of No Significant Impact (FONSI)
        • Midland Greenway Advisory Committee
        • Right Of Way
        • Shifting Gears
        • Design Guidelines
        • Documents
          • US24W Environmental Assessment CSS Approach
          • US24W Schedule Flowchart
          • 04-22-09 Aesthetic Working Group Session
          • 01-21-09 Aesthetic Working Group Session
          • 11-19-08 Aesthetic Working Group Session
          • EA.pdf
          • Final Study Process Chart.pdf
          • history.pdf
          • launch_release.pdf
          • schedulechart10-27-04.pdf
          • team.pdf
          • US24_flowchart.pdf
          • US24_flowchart 10-21-04.pdf
          • US24_flowchart_web.pdf
          • us24_limits.pdf
          • vcc_3-05.pdf
          • web_schedule.pdf
          • Combined Idea List
          • Critical Issues with Comments
          • August 28, 2008 Open House
          • August 24, 2006 Open House
            • US 24 West Environmental Assessment - Presentation August 24, 2006
            • Questions and Answers
              • Access
              • Aesthetics
              • Alternative Modes and Routes
              • Construction and Phasing
              • Coordination and Partnerships
              • Design Options
              • Environmental
              • Funding
              • Miscellaneous Questions
              • Right of Way
              • Traffic
            • Design Options
          • May 10, 2006 Open House
          • Planning Documents
          • Project Schedule 0908
          • Midland Greenway Brochure 2009
          • March 2008 Postcard
          • September 2005 Newsletter
          • Fall 2004 Newsletter
          • Spring 2007 Newsletter
          • Summer 2008 Newsletter
          • Project Update March 2007
          • What are the problems
          • Background Information
          • Project Planning
          • Alternatives
          • Since You Asked
          • Traffic and Design
          • Traffic Operations
          • Answers to Recent Questions
          • Economic Facts
          • Level 3 Alternatives Key Messages
          • Level 3 Evaluation of Alternatives
          • Noise Brochure
          • Build Alternative
          • PM Jan 20 2005
          • PM April 14, 2005
          • PM June 21, 2005
          • PM Nov 10, 2005
          • PM Jan 25, 2006
          • April 12, 2006
          • Design Option Aug 24 2006
          • Process Chart 3-05
          • Critical Issues
          • Spring 07 Newsletter
          • Frequently Asked Questions (FAQs)
          • Updated flow chart
          • Slide 13 Map
  • Flood-Related Projects
  • Central 70
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • CDOT Projects Overview
  • C470 - Wadsworth Boulevard to I-70 NEPA and Preliminary Design
  • I-25 (US 36 to 104th Ave) Improvements
  • CO 7 Lower (Lyons to Raymond)
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • I-270 Corridor Improvements
  • Southeastern CO Centerline Rumble Strip Installation
  • Teller County
  • US 50 Bonforte to Avondale Resurfacing
  • Weld County ADA Ramps
  • US 285 Resurfacing between Monte Vista and Saguache
  • US 50 La Junta Microsurfacing
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Park County Chain-Up Stations
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • ITS Installation of Road Side Connected Vehicles
  • CO 133 Bowie Chip Seal
  • CO 1 Wellington South Resurfacing
  • I-70 Median Cable Rail in Eagle County
  • CO 115 Improvements - Colorado Springs to Penrose
  • CO 52 and Weld County Road 37 Intersection Improvements
  • CO 121/Wadsworth Signal Improvements in Jefferson County
  • Interstates
  • US Highways
  • State Highways
  • Denver Metro Area
  • Central/Eastern Colorado
  • Northeastern Colorado
  • Northwestern Colorado
  • Southeastern Colorado
  • Southwestern Colorado
  • I-70 Wildlife Fence in Eagle County
  • CO 72 Chipseal in Larimer County
  • CO 71 Passing Lane Construction from Limon to Brush
  • Southeastern Colorado Pavement Marking
  • CO 72 Frontage Road to Indiana Street Resurfacing
  • Denver Metro Bridge Safety Improvements
  • US 385 North of Cheyenne Wells
  • I-70 Wrong Way Detection Maintenance
  • US 85 Corridor Improvements
  • US 550 Chipeta Traffic Signal Installation
  • US 40 - Colfax and Quail Signal Replacement
  • CO 71 Bridge Repair Otero County
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • US 160-CR 225 Intersection Improvements
  • I-76 Over Clear Creek Scour Mitigation
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • CO 52 Culvert Extension at Weld County Road 19
  • Clear Creek Scour Mitigation on I-70
  • I-70 Salt Wash Bridges Scour, Mesa County
  • US 34 Brush Lateral Canal Repair
  • C-470 Trail Bridge over Acres Green
  • US 287 & CO 52 Intersection Safety Improvements
  • I-25 & Alameda Bridge Replacement
  • CO 83 Douglas County Sign Replacement
  • US 85 at County Road 14.5 Intersection Improvements
  • I-70 Bridges over Ward Road
  • I-25 Concrete Panel Replacement
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 12 Bridge Replacement in Las Animas County
  • CO 115 in Fremont County and US 50 in Pueblo County Sign Replacement
Questions and Answers https://www.codot.gov/projects/studies/study-archives/us24west/documents/august-24-2006-open-house/questions-and-answers https://www.codot.gov/@@site-logo/siteLogo.png

Questions and Answers

Access
Aesthetics
Alternative Modes and Routes
Construction and Phasing
Coordination and Partnerships
Design Options
Environmental
Funding
Miscellaneous Questions
Right of Way
Traffic

Need More Help?

Sign Up for Travel Alerts & News

CDOT Travel Alerts icon

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo