Divide Corridor Improvements | US 24 & CO 67 Study

About the Study

The Colorado Department of Transportation (CDOT) is evaluating transportation improvements in Divide along the corridor of intersection of US 24 and CO 67 in response to anticipated growth in the community and surrounding area. The study will review traffic operations, roadway safety, access to adjacent properties and opportunities to increase the capacity of the corridor to better accommodate current and future travel needs. The project will also evaluate access management strategies and multimodal opportunities to support safer, more efficient travel through the corridor. Recommendations will be developed using technical analysis and community input to help guide future transportation improvements and access management in Divide.

Schedule & Important Dates

  • Study Start: Fall 2026
  • Public Meeting Date:
    • Open House Listening Session
      Monday, Nov. 9, 2026 from 5 to 7:30 p.m.
      Teller County Sheriff’s Office
      11400 US 24
      Divide, CO

Project Area

The project is located near the junction of US 24 and CO 67 in Divide, Teller County. Study limits are:

  • CO 67: Milepost 67 (Divide South Drive) to Milepost 69.95 (US 24)
  • County Road 5: US 24 to Cedar Mountain Road
  • US 24: Milepost 276 (Twin Rocks Road) to Milepost 280 (Tranquil Acres Road)
Map of Divide Corridor, specifically the intersection and surrounding area of US 24 and CO 67.
Map of Divide Corridor, specifically the intersection and surrounding area of US 24 and CO 67.

Project goals include:

  • Increased capacity
  • Improved safety
  • A higher level of service
  • Developed access management
  • Consideration of multimodal transportation opportunities