Southwestern Colorado Culvert Repairs
About the Project
This is a culvert improvement project at 19 sites throughout six southwestern Colorado counties.
Improvements will take place in the following counties:
- Archuleta
- Conejos
- La Plata
- Montezuma
- Rio Grande
- Saguache
Work this Week & Lane Closures for Southwestern Colorado Culvert Repairs
Project Facts
- Construction Cost: $9 million
- Contractor: Native Sun
- Timeline: February 2026 to August 2026
- Location: CO 17, CO 41, CO 151, CO 172, CO 184, US 160 and US 285
- Nearest Towns/Cities: Cortez, Mancos, Durango, Ignacio, Monte Vista, Del Norte, Antonito, Bayfield, Towoac and Saguache
- Mile Points:
- CO 17: MP 10.5
- CO 41: MP 8.6, MP 5, MP 18.24, MP 53.3, MP 85.5
- CO 151: MP 2.7 and MP 4.3
- CO 172: MP 3.4 and MP 4.4
- US 160: MP 47.8, MP 54.7, MP 64, MP 194.4 and MP 117.1
- US 285: MP 7.08 and MP 7.29
- US 550: MP 28.7
- Counties: Archuleta, Conejos, La Plata, Montezuma, Rio Grande and Saguache
Project Benefits
The new technology used in this project provides the following benefits:
- Adds a 50-year design life to existing infrastructure
- Extends the longevity of critical road infrastructure
- Lowers the risks associated with water runoff and flooding
- Maintains safe driving conditions for motorists
- Allows for the existing pipe to stay operational and in place with no excavation or trenching needed
- Takes less time to complete
- Fewer impacts to traveling public
Work Schedule
To be announced.
Traffic Impacts
- Refer to COtrip.org for real-time travel conditions and road closures