Southwestern Colorado Culvert Repairs

About the Project

This is a culvert improvement project at 19 sites throughout six southwestern Colorado counties.

Improvements will take place in the following counties:

  • Archuleta
  • Conejos
  • La Plata
  • Montezuma
  • Rio Grande
  • Saguache

Work this Week & Lane Closures for Southwestern Colorado Culvert Repairs

Project Facts

  • Construction Cost: $9 million
  • Contractor: Native Sun
  • Timeline: February 2026 to August 2026
  • Location: CO 17, CO 41, CO 151, CO 172, CO 184, US 160 and US 285
    • Nearest Towns/Cities: Cortez, Mancos, Durango, Ignacio, Monte Vista, Del Norte, Antonito, Bayfield, Towoac and Saguache
    • Mile Points:
      • CO 17: MP 10.5
      • CO 41: MP 8.6, MP 5, MP 18.24, MP 53.3, MP 85.5
      • CO 151: MP 2.7 and MP 4.3
      • CO 172: MP 3.4 and MP 4.4
      • US 160: MP 47.8, MP 54.7, MP 64, MP 194.4 and MP 117.1
      • US 285: MP 7.08 and MP 7.29
      • US 550: MP 28.7
    • Counties: Archuleta, Conejos, La Plata, Montezuma, Rio Grande and Saguache

Project Benefits

The new technology used in this project provides the following benefits:

  • Adds a 50-year design life to existing infrastructure
  • Extends the longevity of critical road infrastructure
  • Lowers the risks associated with water runoff and flooding
  • Maintains safe driving conditions for motorists
  • Allows for the existing pipe to stay operational and in place with no excavation or trenching needed
  • Takes less time to complete
  • Fewer impacts to traveling public

Work Schedule

To be announced.


Traffic Impacts

  • Refer to COtrip.org for real-time travel conditions and road closures