Construction and Design Notices

These notices are used to convey Design and Construction Project Support general information.
File Double-sided Plan Sheets
Design Notice 2015-2. May 29, 2015. Effective immediately, when hardcopy printouts are required they should be printed double-sided to conserve paper.
File CDOT Pipe Material Selection Guide Update
Design Notice 2015-1. May 11, 2015. The CDOT Pipe Material Selection Policy was initially developed by the Project Development Branch for approval by the Chief Engineer. However, this document is no longer required to be a separate policy document that requires the Chief Engineer’s approval.