You are here: Home Business Center Design & Construction Project Support Construction Specifications 2021 Construction Specifications Standard Special Provisions Revisions to Sections 200 thru 500 Revisions to Sections 200 thru 500 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2021-construction-specifications/rev-ssp/rev-secs200-500-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Sections 200 thru 500 REVISION OF SECTION 202 - REMOVAL OF BRIDGE REVISION OF SECTION 207 - TOPSOIL REVISION OF SECTION 208 - AS-CONSTRUCTED SURVEY REVISION OF SECTION 208 - EROSION CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre. REVISION OF SECTION 212 - SOIL AMENDMENTS, SEEDING, AND SODDING REVISION OF SECTION 214 - NURSERY STOCK CONTAINERS AND UNROOTED CUTTINGS REVISION OF SECTION 401 - COMPOSITION OF MIXTURES – VOIDS ACCEPTANCE REVISION OF SECTION 401 - RECLAIMED ASPHALT PAVEMENT REVISION OF SECTION 401 - TOLERANCES FOR HOT MIX ASPHALT (VOIDS ACCEPTANCE) REVISION OF SECTION 412 - REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT REVISION OF SECTIONS 412 AND 705 - PREFORMED COMPRESSION SEALS REVISION OF SECTION 504 & 641 - WALLS REVISION OF SECTION 509 - STEEL STRUCTURES REVISION OF SECTION 512 - BEARING DEVICE REVISION OF SECTION 518 - MODULAR JOINT TESTING REVISION OF SECTION 518 - WATERSTOPS AND EXPANSION JOINTS
Revisions to Sections 200 thru 500 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2021-construction-specifications/rev-ssp/rev-secs200-500-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Sections 200 thru 500 REVISION OF SECTION 202 - REMOVAL OF BRIDGE REVISION OF SECTION 207 - TOPSOIL REVISION OF SECTION 208 - AS-CONSTRUCTED SURVEY REVISION OF SECTION 208 - EROSION CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre. REVISION OF SECTION 212 - SOIL AMENDMENTS, SEEDING, AND SODDING REVISION OF SECTION 214 - NURSERY STOCK CONTAINERS AND UNROOTED CUTTINGS REVISION OF SECTION 401 - COMPOSITION OF MIXTURES – VOIDS ACCEPTANCE REVISION OF SECTION 401 - RECLAIMED ASPHALT PAVEMENT REVISION OF SECTION 401 - TOLERANCES FOR HOT MIX ASPHALT (VOIDS ACCEPTANCE) REVISION OF SECTION 412 - REMOVAL AND REPLACEMENT OF CONCRETE PAVEMENT REVISION OF SECTIONS 412 AND 705 - PREFORMED COMPRESSION SEALS REVISION OF SECTION 504 & 641 - WALLS REVISION OF SECTION 509 - STEEL STRUCTURES REVISION OF SECTION 512 - BEARING DEVICE REVISION OF SECTION 518 - MODULAR JOINT TESTING REVISION OF SECTION 518 - WATERSTOPS AND EXPANSION JOINTS
REVISION OF SECTION 208 - EROSION CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre.