Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. US 6 & Wadsworth Boulevard
  4. Assets
  5. Environmental Assessment and Draft Section 4(f) Evaluation
  6. Appendix_C Supporting Documentation
Quick Links
  • US 6 & Wadsworth Boulevard Interchange Improvements Homepage
  • Project History 
    • Phase 1: Wadsworth Boulevard from 10th Avenue to West Colfax Avenue
    • Phase 2: Wadsworth Boulevard from Highland Drive to 10th Avenue
    • Phase 3: Southwest Quadrant Improvements at US 6 & Wadsworth Boulevard
    • Phase 4: US 6 & Wadsworth Boulevard Interchange Reconstruction
    • Phase 5: 12th Avenue/Wadsworth Boulevard Water Quality Pond
  • Air Quality Information
  • Submit Questions & Comments
Appendix_C Supporting Documentation https://www.codot.gov/projects/US6wadsworth/assets/docs/appendix_c https://www.codot.gov/@@site-logo/siteLogo.png

Appendix_C Supporting Documentation

Appendix_C Existing Conditions Report- Engineering Design Elements.pdf
Appendix_C Existing Conditons Report- Environmental Conditions.pdf
Appendix_C Alternatives Development and Screening Report.pdf
Appenix_C Level 1 Screening Addendum- Folded Diamond.pdf
Appendix_C Project Atlas.pdf
Appendix_C Draft 15% Roadway Plan and Profile Sheets.pdf
Appendix_C Frontage Road Options.pdf
Appendix_C Section 4(f) Avoidance Options.pdf
Appendix_C Stakeholder Involvement Plan.pdf
Appendix_C Stakeholder Involvement Plan Appendix.pdf
Appendix_C Scoping Summary Report.pdf
Appendix_C Open House 2 Summary Report and Addendices.pdf
Appendix_C Open House 3 Summary Report and Appendices.pdf
Appendix_C Noise Assessment and Mitigation Meeting Summary Report.pdf
Appendix_C Jefferson County Open School Meeting Minutes.pdf
Appendix_C Agency Correspondence.pdf
Appendix_C Air Quality.pdf
Appendix_C Biological Field Review Meeting Minutes.pdf
Appendix_C Biological Field Review Addendum.pdf
Appendix_C Environmental Justice.pdf
  • 1
  • 2
  • Next 16 items

Tags:
  • Denver/Central Colorado (Region 1)
  • Project: US 6 Wadsworth
Contact Us

Project Hotline: 720-639-8723

Email:
[email protected]

Sign up for Project Updates

Sign Up for US 6 & Wadworth Boulevard Interchange Improvements Project Updates

Resources
  • Video: History of Lakewood Near US 6 and Wadsworth
  • US 6 and Wadsworth Environmental Assessment, June 2009
  • US 6 and Wadsworth Finding of No Significant Impact, March 2010

US 6 Wadsworth Project Photos

Stay Informed

Sign up for project updates by clicking the link below:

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo