You are here: Home Business Center Design & Construction Project Support Construction Specifications 2021 Construction Specifications Standard Special Provisions Revisions to Section 100 Revisions to Section 100 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2021-construction-specifications/rev-ssp/rev-sec100-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Section 100 REVISION OF SECTIONS 101 AND 106 - ENVIRONMENTAL PRODUCT DECLARATIONS REVISION OF SECTION 103 - COLORADO RESIDENT BID PREFERENCE REVISION OF SECTION 103 - CONSIDERATION OF PROPOSALS REVISION OF SECTION 103 - ESCROW OF PROPOSAL DOCUMENTATION REVISION OF SECTION 105 - CONSTRUCTION DRAWINGS REVISION OF SECTION 105 - CONTROL OF WORK (TABLE 105-1) REVISION OF SECTION 105 - CONTROL OF WORK (105.20) REVISION OF SECTION 105 - CONTROL OF WORK (105.21) REVISION OF SECTION 105 - PAY FACTOR ON INCENTIVE/DISINCENTIVE REVISION OF SECTIONS 105 AND 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (VOIDS ACCEPTANCE) REVISION OF SECTION 106 - BUY AMERICA REQUIREMENTS REVISION OF SECTION 106 - BUY AMERICA REQUIREMENTS NON-FEDERAL AID REVISION OF SECTION 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS) REVISION OF SECTION 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS WITH VOLUMETRIC VERIFICATION) REVISION OF SECTION 106 - COUNTRY OF ORIGIN REVISION OF SECTIONS 106 AND 412 - PCCP THICKNESS REVISION OF SECTION 107 – PERFORMANCE OF SAFETY CRITICAL WORK REVISION OF SECTION 107 - WATER QUALITY CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre. REVISION OF SECTION 108 - EXTENSION OF CONTRACT TIME REVISION OF SECTION 109 - ASPHALT CEMENT COST ADJUSTMENT (ASPHALT CEMENT INCLUDED IN THE WORK) 1 2 Next 3 items
Revisions to Section 100 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2021-construction-specifications/rev-ssp/rev-sec100-ssp https://www.codot.gov/@@site-logo/siteLogo.png Revisions to Section 100 REVISION OF SECTIONS 101 AND 106 - ENVIRONMENTAL PRODUCT DECLARATIONS REVISION OF SECTION 103 - COLORADO RESIDENT BID PREFERENCE REVISION OF SECTION 103 - CONSIDERATION OF PROPOSALS REVISION OF SECTION 103 - ESCROW OF PROPOSAL DOCUMENTATION REVISION OF SECTION 105 - CONSTRUCTION DRAWINGS REVISION OF SECTION 105 - CONTROL OF WORK (TABLE 105-1) REVISION OF SECTION 105 - CONTROL OF WORK (105.20) REVISION OF SECTION 105 - CONTROL OF WORK (105.21) REVISION OF SECTION 105 - PAY FACTOR ON INCENTIVE/DISINCENTIVE REVISION OF SECTIONS 105 AND 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (VOIDS ACCEPTANCE) REVISION OF SECTION 106 - BUY AMERICA REQUIREMENTS REVISION OF SECTION 106 - BUY AMERICA REQUIREMENTS NON-FEDERAL AID REVISION OF SECTION 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS) REVISION OF SECTION 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS WITH VOLUMETRIC VERIFICATION) REVISION OF SECTION 106 - COUNTRY OF ORIGIN REVISION OF SECTIONS 106 AND 412 - PCCP THICKNESS REVISION OF SECTION 107 – PERFORMANCE OF SAFETY CRITICAL WORK REVISION OF SECTION 107 - WATER QUALITY CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre. REVISION OF SECTION 108 - EXTENSION OF CONTRACT TIME REVISION OF SECTION 109 - ASPHALT CEMENT COST ADJUSTMENT (ASPHALT CEMENT INCLUDED IN THE WORK) 1 2 Next 3 items
REVISION OF SECTION 106 - CONFORMITY TO THE CONTRACT OF HOT MIX ASPHALT (LESS THAN 5000 TONS WITH VOLUMETRIC VERIFICATION)
REVISION OF SECTION 107 - WATER QUALITY CONTROL (Under One Acre of Disturbance) Use on projects with an anticipated disturbance of less than one acre.