Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Business
You are here:
  1. Home
  2. Business Center
  3. Design & Construction Project Support
  4. Construction Specifications
  5. 2025 Construction Specifications
  6. Standard Special Provisions
  7. Revisions to Sections 200 thru 500
Revisions to Sections 200 thru 500 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2025-construction-specifications/rev-ssp/rev-secs200-500-ssp https://www.codot.gov/@@site-logo/siteLogo.png

Revisions to Sections 200 thru 500

Revision of Section 206 Shoring
Revision of Section 207 – Topsoil
Revision of Section 208 – Erosion Control (Under One Acre of Disturbance)

Use on projects with an anticipated disturbance of less than one acre.

Revision of Section 212 – Soil Amendments, Seeding, and Sodding
Revision of Section 401 SafetyEdge for Pavement
Revision of Section 401 – Composition of Mixtures – Voids Acceptance
Revision of Section 401 - Plant Mix Pavements - General

January 8, 2024. Subsection 401.17

Revision of Section 401 - Reclaimed Asphalt Pavement
Revision of Section 401 – Tolerances for Hot Mix Asphalt (Voids Acceptance)
Revision of Section 412 SafetyEdge for Pavement
Revision of Sections 412 and 601 Accelerated Pavement Repair Concrete
Revision of Sections 412 and 705 – Preformed Compression Seals
Revision of Section 504 – Walls
Revision of Section 509 Steel Structures

Tags:
  • Construction Specifications
Contact Us

CDOT Project Support 
[email protected]
If you are a CDOT employee, consultant, or contractor and would like to receive emails about the latest updates and revisions to these websites, please email us using the email above. Include your name, company name, and the email address that you would like to receive this information.


Bill Cornelius, P.E.
State Standards and Specifications Engineer
Unit Manager
[email protected]

Michele Kayen, P.E.
Specifications Engineer
[email protected]

David Kosmiski, P.E.
M Standards Engineer
[email protected]

Amin Fakhimalizad
Assistant M Standards Engineer
[email protected]

Vacant
Process and Innovation Engineer

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo