The Latest IconGet the latest developments with the progress of the Colorado Remote Tower Project.

August 20-23, 2018 - Camera Masts and Cameras Installed

The three camera masts were installed; one near the FNL fuel farm, and masts on the east side of the taxiway, near each end of Runway 15/33.
Camera Masts being installed Mast Installation


Camera Mast Installation Camera Masts being installed

Camera Mast Installation


Week of July 1st, 2018 - Underground Utilities Installation

Installation of the underground communications and electric utilities connecting the camera masts to the controller facility.

 


Late July 2018 - Camera Mast Foundations Installed

Concrete forms poured for the north-end camera masts.
Mast Footing Mast Footing 2

Mast Footing 6 Mast Footing 1

March 2, 2018 - Core Sampling

The very first dirt was moved to gather earth core samples.  These samples will be analyzed to provide engineers with the appropriate information to design the foundations that each camera mast will be constructed upon. 

Core Sample Drilling Core Sampling