You are here: Home Projects Archived Project Sites I-25 Exit 11 Interchange Improvements Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews placing girders on new bridge superstructure Jan 4 2022 (1).jpg direct overhead view of NB girder placement.jpg girder being lifted for placement on new bridge.jpg girder getting ready to be hoisted onto the new superstructure.jpg overhead view of girder placement.jpg panorama girder placement.jpg Girder placement new bridge over I25 at Exit 11.jpg Crews placing first girder new bridge over I25 at Exit 11.jpg southwest view new retaining wall under construction with piles in place.jpg good overview of SB.JPG long wide view SB.JPG good SB view of existing bridge and country roads.JPG closeup nb approaching bridge.JPG NB view showing CR69.1 and frontage road east.JPG surrounding area Exit 11.jpg southbound view project limits.jpg shell entrance.jpg overview existing bridge I 25 and arterials.jpg overview bridge SB I-25.jpg off ramp Exit 11.jpg northwest view approach exit 11.jpg high overview SB at Exit 11.jpg NB approach Exit 11.JPG east view at existing bridge.jpg condition existing bridge.jpg closeup roadways at Exit 11.jpg County Road 69.jpg Sand Shed at Trinidad POE.jpg Northwest view of Trinidad Port of Entry and Sand Shed.jpg Bridge at Exit 11 will be replaced.jpg Photo Opp Gov Polis Exec Dir Lew (1).jpg State Park sign at Exit 11.jpg Exit 11 sign northbound.jpg Shoshana Lew Exec Dir of CDOT opens the ceremony.jpg Photo Opp Gov Polis Exec Dir Lew.jpg VIPs kickoff the groundbreaking.jpg Gov Polis making remarks at the groundbreaking ceremony.jpg Wide west view of area to Trinidad Lake and State Park.jpg Southeast view of Exit 11 with Fishers Peak.jpg Southeast view of Exit 11 interchange in its current condition.jpg Fishers Peak.jpg Port of Entry backed by Fishers Peak.jpg Overview Exit 11.jpg Fishers Peak mesa.jpg East view from Exit 11 showing Fishers Peak.jpg Exit 11 construction will improve access to Fishers Peak.jpg google map traffic shift 8 25 2021 SB I-25 ramp detours Exit 11.jpg Crews compacting and rolling new asphalt detour pavement at Exit 11.JPG Close up of crews paving detour pavement at SB I-25 adjacent to on ramp.JPG new safety barrier in place on detour pavement.JPG striping underway on detour pavement SB I-25 Exit 11.JPG Crews applying asphalt pavement to new detour route to access SB I-25 from Exit 11 (1).JPG New on ramp detour configuration at Exit 11.JPG new detour pavement adjacent to Exit 11 off ramp.JPG newly paved and striped 69.1.JPG Crews getting SB I-25 right lane ready for closure.jpg Crews erecting barrier and striping SB I-25 at Exit 11.jpg Crews improving Shell entrance.jpg New curb and gutter work at Shell Gas Station Exit 11.jpg Improved access underway at the Shell Gas Station Exit 11.jpg West view new curb and gutter work in progress.JPG Newly poured concrete for tie in at sidewalk and ADA ramp.JPG South view east MSE wall area for NB I-25.JPG South view temporary ramp to east roundabout for Phase 2 construction.JPG East view new island at Shell Station at Exit 11.JPG wide view of pre drilling h pile in progress.jpg closeup crews pre drilling abutment piles.jpg Pre drilling underway for H-pile west side of Exit 11.jpg Flatiron crews drilling piles for bridge abutment.jpg Crews drilling piles for bridge abutment west side.jpg southwest view new h piles in place for bridge abutment.jpg H piles in place for west side abutment new bridge Exit 11.jpg Dirt work underway for west side roundabout Exit 11.jpg H piles in place on west and east sides of I-25 at Exit 11.JPG Drainage pipe at east side of Exit 11 across from Shell Station.JPG Project Panoramic View southwest aerial view construction underway.jpg Drone view of construction of new bridge at Exit 11.jpg Access improvements to Shell Station underway.jpg southbound I-25 detour configuration.JPG south drone view of roundabout and bridge abutment work (1).JPG east view of new bridge construction underway (1).JPG closeup drone view of the west side of Exit 11 under construction (1).JPG wide southwest view of ongoing construction at Exit 11.JPG the new breidge location shown by h piles in place.JPG south drone view of detour configuration of on and off ramps EXIT 11.JPG excavation work northeast side of Exit 11 between i 25 and santa fe trail.JPG Paving underway at Shell Station entrance.jpg Paving at the Shell Station Entrance Exit 11.jpg Paver Exit 11 northeast Shell Gas Station.jpg Crews paving Shell entrance.jpg Closeup paving crews at Shell Station at Exit 11.jpg wide west view new retaining wall.jpg southwest view new retaining wall under construction with piles in place (1).jpg Reconstruction of a section of the Santa Fe Trail at Exit 11.jpg Crews reconstructing a section of the Santa Fe Trail at the Holiday Inn Express.jpg Crews lowering and grading Santa Fe Trail.jpg Crews paving newly reconstructed section of the Santa Fe Trail at Exit 11.jpg wide view of new detour configuration on the east side of Exit 11.jpg southwest ground level view of new bridge structure at Exit 11.jpg Newly erected east retaining wall Exit 11.jpg Deck pans being installed on new bridge structure I-25 at Exit 11 (1).jpg Deck pans being installed on new bridge structure I-25 at Exit 11 (2).jpg wide overview of new bridge structure and detours.jpg wide view new retaining wall at Exit 11.jpeg east view rebar on new bridge structure at Exit 11.jpeg Newly erected retaining walls at Exit 11.jpeg Deck Pour 3 31 22.jpg new bridge structure showing sidewalk at left Photo Steve Spera.jpg crews working on sidewalk of new bridge Exit 11 Photo Steve Spera.jpg Crews stamping sidewalk on new bridge Photo Steve Spera.jpg new curbs and improvements underway for east roundabourt.jpg curb and gutter work new sb on ramp Exit 11.jpg New southbound on ramp under construction photo steve spera.jpg Improvements underway to County Road 69.1.jpg Interchange improvements include widening county road access at Exit 11.jpg new curbs and improvements underway for east roundabourt (1).jpg curb and gutter work new sb on ramp Exit 11 (1).jpg New southbound on ramp under construction photo steve spera (1).jpg Interchange improvements include widening county road access at Exit 11 (1).jpg wide view newly built west roundabout at Exit 11.jpg west roundabout under construction credit Aaron Yeh.jpg crews working on the west roundabout at Exit 11.jpg north view of southbound I-25 Exit 11 on ramp under construction Photo Steve Spera.jpg Hardscaping new west roundabout Photo Steve Spera.jpg Closeup hardscaping material west roundabout Photo Steve Spera.jpg Crews paving west roundabout photo Steve Spera.jpg Paving underway new southbound off ramp Photo Steve Spera.jpg Northwest view new MSE walls and guardrail photo Steve Spera.jpg Crews installing safety fence on new bridge at Exit 11 photo Steve Spera.jpg wide view newly painted wall at NB off ramp Exit 11.jpg northbound view of new bridge.jpg closeup roundabout Aaron Westhoff.jpg closeup of wall texture and paint.jpg Southeast view painted walls NB off ramp.jpg wide view roundabout and paving view of Fishers Peak Photo Aaron Westhoff Yeh and Associates.jpg North view of Exit 11.JPG northbound view approaching Exit 11.JPG Drone view new interchange improvements Philip Hull.JPG closeup west view new bridge and roundabouts.JPG closeup drone view east side roundabout.JPG Northwest view new I-25 wall and west roundabout.JPG Wide view new east side improvements Exit 11 interchange Photo Estate Media.jpg Ribbon Cutting banners with Fishers Peak in the background.jpg Polis speaking at Ribbon Cutting Exit 11.jpg New retaining wall northeast Exit 11 interchange Photo Estate Media.jpg West view new bridge and roundabout photo Philip Hull Yeh and Assoc.jpg Demolition of old Exit 11 bridge underway photo Steve Spera.jpg Completion of bridge demo 9 22 22 photo Steve Spera.jpg south view old bridge removed Phil Hull 9 22 22.JPG overhead view new east roundabout Phil Hull 9 22 22.JPG north view Exit 11 new bridge and roundabouts Phil Hull 9 22 22.JPG drone view oversized loads on new roundabout Phil Hull 9 22 22.JPG crews removing the old Exit 11 bridge Phil Hull 9 22 22.JPG drone view roundabouts after bridge demo 9 22 22.JPG New overhead sign at Exit 11.jpg Drone view new interchange improvements Philip Hull (1).JPG Wide view of new roundabout Carlos Madrid.jpg Southbound I-25 off ramp onto roundabout Carlos Madrid.jpg New signage and crosswalks at roundabout Carlos Madrid.jpg New pedestrian crosswalk Santa Fe Trail Carlos Madrid.jpg Southbound I-25 off ramp onto roundabout Carlos Madrid.jpeg Wide view of new roundabout Carlos Madrid.jpeg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/i25-exit11-trinidad-intersection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Crews placing girders on new bridge superstructure Jan 4 2022 (1).jpg direct overhead view of NB girder placement.jpg girder being lifted for placement on new bridge.jpg girder getting ready to be hoisted onto the new superstructure.jpg overhead view of girder placement.jpg panorama girder placement.jpg Girder placement new bridge over I25 at Exit 11.jpg Crews placing first girder new bridge over I25 at Exit 11.jpg southwest view new retaining wall under construction with piles in place.jpg good overview of SB.JPG long wide view SB.JPG good SB view of existing bridge and country roads.JPG closeup nb approaching bridge.JPG NB view showing CR69.1 and frontage road east.JPG surrounding area Exit 11.jpg southbound view project limits.jpg shell entrance.jpg overview existing bridge I 25 and arterials.jpg overview bridge SB I-25.jpg off ramp Exit 11.jpg northwest view approach exit 11.jpg high overview SB at Exit 11.jpg NB approach Exit 11.JPG east view at existing bridge.jpg condition existing bridge.jpg closeup roadways at Exit 11.jpg County Road 69.jpg Sand Shed at Trinidad POE.jpg Northwest view of Trinidad Port of Entry and Sand Shed.jpg Bridge at Exit 11 will be replaced.jpg Photo Opp Gov Polis Exec Dir Lew (1).jpg State Park sign at Exit 11.jpg Exit 11 sign northbound.jpg Shoshana Lew Exec Dir of CDOT opens the ceremony.jpg Photo Opp Gov Polis Exec Dir Lew.jpg VIPs kickoff the groundbreaking.jpg Gov Polis making remarks at the groundbreaking ceremony.jpg Wide west view of area to Trinidad Lake and State Park.jpg Southeast view of Exit 11 with Fishers Peak.jpg Southeast view of Exit 11 interchange in its current condition.jpg Fishers Peak.jpg Port of Entry backed by Fishers Peak.jpg Overview Exit 11.jpg Fishers Peak mesa.jpg East view from Exit 11 showing Fishers Peak.jpg Exit 11 construction will improve access to Fishers Peak.jpg google map traffic shift 8 25 2021 SB I-25 ramp detours Exit 11.jpg Crews compacting and rolling new asphalt detour pavement at Exit 11.JPG Close up of crews paving detour pavement at SB I-25 adjacent to on ramp.JPG new safety barrier in place on detour pavement.JPG striping underway on detour pavement SB I-25 Exit 11.JPG Crews applying asphalt pavement to new detour route to access SB I-25 from Exit 11 (1).JPG New on ramp detour configuration at Exit 11.JPG new detour pavement adjacent to Exit 11 off ramp.JPG newly paved and striped 69.1.JPG Crews getting SB I-25 right lane ready for closure.jpg Crews erecting barrier and striping SB I-25 at Exit 11.jpg Crews improving Shell entrance.jpg New curb and gutter work at Shell Gas Station Exit 11.jpg Improved access underway at the Shell Gas Station Exit 11.jpg West view new curb and gutter work in progress.JPG Newly poured concrete for tie in at sidewalk and ADA ramp.JPG South view east MSE wall area for NB I-25.JPG South view temporary ramp to east roundabout for Phase 2 construction.JPG East view new island at Shell Station at Exit 11.JPG wide view of pre drilling h pile in progress.jpg closeup crews pre drilling abutment piles.jpg Pre drilling underway for H-pile west side of Exit 11.jpg Flatiron crews drilling piles for bridge abutment.jpg Crews drilling piles for bridge abutment west side.jpg southwest view new h piles in place for bridge abutment.jpg H piles in place for west side abutment new bridge Exit 11.jpg Dirt work underway for west side roundabout Exit 11.jpg H piles in place on west and east sides of I-25 at Exit 11.JPG Drainage pipe at east side of Exit 11 across from Shell Station.JPG Project Panoramic View southwest aerial view construction underway.jpg Drone view of construction of new bridge at Exit 11.jpg Access improvements to Shell Station underway.jpg southbound I-25 detour configuration.JPG south drone view of roundabout and bridge abutment work (1).JPG east view of new bridge construction underway (1).JPG closeup drone view of the west side of Exit 11 under construction (1).JPG wide southwest view of ongoing construction at Exit 11.JPG the new breidge location shown by h piles in place.JPG south drone view of detour configuration of on and off ramps EXIT 11.JPG excavation work northeast side of Exit 11 between i 25 and santa fe trail.JPG Paving underway at Shell Station entrance.jpg Paving at the Shell Station Entrance Exit 11.jpg Paver Exit 11 northeast Shell Gas Station.jpg Crews paving Shell entrance.jpg Closeup paving crews at Shell Station at Exit 11.jpg wide west view new retaining wall.jpg southwest view new retaining wall under construction with piles in place (1).jpg Reconstruction of a section of the Santa Fe Trail at Exit 11.jpg Crews reconstructing a section of the Santa Fe Trail at the Holiday Inn Express.jpg Crews lowering and grading Santa Fe Trail.jpg Crews paving newly reconstructed section of the Santa Fe Trail at Exit 11.jpg wide view of new detour configuration on the east side of Exit 11.jpg southwest ground level view of new bridge structure at Exit 11.jpg Newly erected east retaining wall Exit 11.jpg Deck pans being installed on new bridge structure I-25 at Exit 11 (1).jpg Deck pans being installed on new bridge structure I-25 at Exit 11 (2).jpg wide overview of new bridge structure and detours.jpg wide view new retaining wall at Exit 11.jpeg east view rebar on new bridge structure at Exit 11.jpeg Newly erected retaining walls at Exit 11.jpeg Deck Pour 3 31 22.jpg new bridge structure showing sidewalk at left Photo Steve Spera.jpg crews working on sidewalk of new bridge Exit 11 Photo Steve Spera.jpg Crews stamping sidewalk on new bridge Photo Steve Spera.jpg new curbs and improvements underway for east roundabourt.jpg curb and gutter work new sb on ramp Exit 11.jpg New southbound on ramp under construction photo steve spera.jpg Improvements underway to County Road 69.1.jpg Interchange improvements include widening county road access at Exit 11.jpg new curbs and improvements underway for east roundabourt (1).jpg curb and gutter work new sb on ramp Exit 11 (1).jpg New southbound on ramp under construction photo steve spera (1).jpg Interchange improvements include widening county road access at Exit 11 (1).jpg wide view newly built west roundabout at Exit 11.jpg west roundabout under construction credit Aaron Yeh.jpg crews working on the west roundabout at Exit 11.jpg north view of southbound I-25 Exit 11 on ramp under construction Photo Steve Spera.jpg Hardscaping new west roundabout Photo Steve Spera.jpg Closeup hardscaping material west roundabout Photo Steve Spera.jpg Crews paving west roundabout photo Steve Spera.jpg Paving underway new southbound off ramp Photo Steve Spera.jpg Northwest view new MSE walls and guardrail photo Steve Spera.jpg Crews installing safety fence on new bridge at Exit 11 photo Steve Spera.jpg wide view newly painted wall at NB off ramp Exit 11.jpg northbound view of new bridge.jpg closeup roundabout Aaron Westhoff.jpg closeup of wall texture and paint.jpg Southeast view painted walls NB off ramp.jpg wide view roundabout and paving view of Fishers Peak Photo Aaron Westhoff Yeh and Associates.jpg North view of Exit 11.JPG northbound view approaching Exit 11.JPG Drone view new interchange improvements Philip Hull.JPG closeup west view new bridge and roundabouts.JPG closeup drone view east side roundabout.JPG Northwest view new I-25 wall and west roundabout.JPG Wide view new east side improvements Exit 11 interchange Photo Estate Media.jpg Ribbon Cutting banners with Fishers Peak in the background.jpg Polis speaking at Ribbon Cutting Exit 11.jpg New retaining wall northeast Exit 11 interchange Photo Estate Media.jpg West view new bridge and roundabout photo Philip Hull Yeh and Assoc.jpg Demolition of old Exit 11 bridge underway photo Steve Spera.jpg Completion of bridge demo 9 22 22 photo Steve Spera.jpg south view old bridge removed Phil Hull 9 22 22.JPG overhead view new east roundabout Phil Hull 9 22 22.JPG north view Exit 11 new bridge and roundabouts Phil Hull 9 22 22.JPG drone view oversized loads on new roundabout Phil Hull 9 22 22.JPG crews removing the old Exit 11 bridge Phil Hull 9 22 22.JPG drone view roundabouts after bridge demo 9 22 22.JPG New overhead sign at Exit 11.jpg Drone view new interchange improvements Philip Hull (1).JPG Wide view of new roundabout Carlos Madrid.jpg Southbound I-25 off ramp onto roundabout Carlos Madrid.jpg New signage and crosswalks at roundabout Carlos Madrid.jpg New pedestrian crosswalk Santa Fe Trail Carlos Madrid.jpg Southbound I-25 off ramp onto roundabout Carlos Madrid.jpeg Wide view of new roundabout Carlos Madrid.jpeg