Santa Fe Bridge Repair
About the Project
Colorado Department of Transportation is completing interim repairs on the Santa Fe Drive (US 85) flyover bridge to eastbound C-470 near Pier 7 in Douglas County. During a recent inspection, the team identified structural deterioration at the pier location. Monitoring equipment has been installed, and traffic has been shifted away from the affected area as a precaution while repairs are completed.
The restriction is limited to the left-hand shoulder. Weight restrictions only impact heavy, overweight trucks. Standard passenger traffic is not impacted.
Project Facts
- Construction Cost: $2.5 million
- Contractor: Ames Construction, Inc.
- Timeline: February 2026 to June 2026
- Location: Southbound Santa Fe Drive (US 85) to EB C-470 flyover bridge, Pier 7
- Nearest Town/City: LIttleton/Highlands Ranch
- Mile Point(s): MP 200 to MP 201
- County: Douglas
Project Benefits
- Improve safety for motorists by addressing structural deterioration at Pier 7
- Restore the bridge’s structural integrity
- Continued reliability on this connection between Santa Fe Drive (US 85) and eastbound C-470
Work Schedule
- Work is expected to begin in early February and continue into early summer 2026
- Some overnight work may be required
- Traffic control setups may be adjusted as needed based on construction activities and safety requirements
Traffic Impacts
Motorists can expect the following impacts during the period of construction:
- A left-hand shoulder closure near the bridge, with barrels and cones in place to shift loads away from the affected area
- Heavy, overweight truck restrictions on the bridge until repairs are complete
- Occasional lane or ramp closures as construction progresses. Impacts are weather dependent
- Refer to COtrip.org for real-time travel conditions and road closures