Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Home
You are here:
  1. Home
Item type
New items since

Search results

RSS Subscribe to an always-updated RSS feed.

4271 items matching your search terms.
Sort by relevance date (newest first) alphabetically
  1. CDOT will begin a repaving project on I-70 from Wadsworth to Pecos after the July 4th holiday weekend

    June 30, 2022 - Central/Eastern Colorado

    Located in News / 2022 / July
  2. CDOT will begin repairs to a bridge on CO 7 over North Saint Vrain Creek in Lyons on Aug. 22

    August 17, 2022 - Northeastern Colorado - Two-way traffic over the bridge will be down to one lane, managed by temporary traffic signals. No closures will be ...

    Located in News / 2022 / August
  3. CDOT will begin resurfacing CO 69 from Westcliffe to Hillside on June 25

    June 23, 2020 - Southeastern Colorado - Crews will resurface the highway and add lane delineators and guardrail to maximize driver safety.

    Located in News / 2020 / June 2020
  4. CDOT will begin surface treatment on US 285 east of Saguache

    July 20, 2023 - Southwestern Colorado - Operations will take place July 25 through August 3

    Located in News / 2023 / July
  5. CDOT will conduct rock scaling along westbound I-70 on June 16

    June 15, 2020 - Denver Metro Area - Motorists can expect full closures of the westbound direction

    Located in News / 2020 / June 2020
  6. CDOT will fully close CO 60 over I-25 and ramps for several nights this weekend

    September 15, 2021 - Northeastern Colorado - Starting Sept. 18, CDOT will close several roadways to divert traffic onto the new CO 60 bridge.

    Located in News / 2021 / September 2021
  7. CDOT will fully close I-25 at WCR 34 and WCR 38 at night twice in June; close WCR 38 over I-25 through the end of the year

    June 3, 2025 - Northeastern Colorado - Various closures required for bridge work for I-25 North Express Lanes project, Mead to Berthoud

    Located in News / 2025 / June
  8. CDOT will host a public meeting Tuesday for construction of the I-25 & Prospect Road Interchange

    September 5, 2019 - Northeastern Colorado

    Located in News / 2019 / September
  9. CDOT will host virtual public meeting to discuss upcoming 21-day closure of CO 60 at I-25 on Aug. 22

    August 17, 2022 - Northeastern Colorado - Join the meeting for upcoming project changes between Berthoud and Johnstown

    Located in News / 2022 / August
  10. CDOT will remove the Farmington Hill traffic signal Thursday evening

    July 24, 2024 - Southwestern Colorado - Plan for full stops and lengthy delays between Durango and Three Springs beginning at 7 p.m.

    Located in News / 2024 / July
  • Previous 10 items
  • 1
  • ...
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • ...
  • 428
  • Next 10 items
Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo