You are here: Home Business Center Civil Rights Programs Assets Design Bid Build Process Guides Design Bid Build Process Guides https://www.codot.gov/business/civilrights/assets/design-bid-build-process-guides-1 https://www.codot.gov/@@site-logo/siteLogo.png Design Bid Build Process Guides 3-5 Complete CDOT Form 1416 (for Pre-Award Only) (Bidder).pdf 3-6 Complete Utilization Plan in B2GNow and Attache Form(s) 1415 and 1416 (if needed) (Bidder).pdf 3-7 Review Submitted Utilization Plan and Associated Form(s) 1415 and Form 1416 (if needed) (CRBRC).pdf 3-8 Approve Utilization Plan in B2GNow (CRBRC).pdf 3-9 Conduct Good Faith Effort Review (CRBRC).pdf 4-1 Set Up Contract in LCPtracker (CRBRC).pdf 4-2 Review Certified Payroll (Project Engineer).pdf 4-3 Reject Certified Payroll (Project Engineer).pdf 4-4 Accept Certified Payroll (Project Engineer).pdf 8-1 Confirm Account Creation in B2GNow (Prime_Sub).pdf 8-2 Determine if Firm will be Performing as a Subcontractor (Form 205) or Supplier (Form 1425) (Prime Contractor).pdf 8-3 Complete CDOT Form 205 or 1425 and Submit in B2G (Prime).pdf 8-4A Personalize the B2GNow Dashboard (PE).pdf 5-2 Review SF 1444 and Submit to CRBRC (RCRO).pdf 5-6 Ensure Payment of Back Wages to Employee(s) if Paid Less than Approved Wage.pdf 7-1 Complete CDOT Form 1337 and Submit to PE_PM (Prime Contractor).pdf 7-2 Review Submitted CDOT Form 1337 and Complete Section D of the Form (RCRO).pdf 7-3 Upload Approved-Denied CDOT Form 1337 into LCPtracker (RCRO).pdf 7-4 Complete Form 838 and Submit to PE_PM (Prime Contractor).pdf 7-11 Review and Approve_Deny of CDOT Form 832 (PE_PM).pdf Previous 20 items 1 2 3 4 5 6 Next 20 items
Design Bid Build Process Guides https://www.codot.gov/business/civilrights/assets/design-bid-build-process-guides-1 https://www.codot.gov/@@site-logo/siteLogo.png Design Bid Build Process Guides 3-5 Complete CDOT Form 1416 (for Pre-Award Only) (Bidder).pdf 3-6 Complete Utilization Plan in B2GNow and Attache Form(s) 1415 and 1416 (if needed) (Bidder).pdf 3-7 Review Submitted Utilization Plan and Associated Form(s) 1415 and Form 1416 (if needed) (CRBRC).pdf 3-8 Approve Utilization Plan in B2GNow (CRBRC).pdf 3-9 Conduct Good Faith Effort Review (CRBRC).pdf 4-1 Set Up Contract in LCPtracker (CRBRC).pdf 4-2 Review Certified Payroll (Project Engineer).pdf 4-3 Reject Certified Payroll (Project Engineer).pdf 4-4 Accept Certified Payroll (Project Engineer).pdf 8-1 Confirm Account Creation in B2GNow (Prime_Sub).pdf 8-2 Determine if Firm will be Performing as a Subcontractor (Form 205) or Supplier (Form 1425) (Prime Contractor).pdf 8-3 Complete CDOT Form 205 or 1425 and Submit in B2G (Prime).pdf 8-4A Personalize the B2GNow Dashboard (PE).pdf 5-2 Review SF 1444 and Submit to CRBRC (RCRO).pdf 5-6 Ensure Payment of Back Wages to Employee(s) if Paid Less than Approved Wage.pdf 7-1 Complete CDOT Form 1337 and Submit to PE_PM (Prime Contractor).pdf 7-2 Review Submitted CDOT Form 1337 and Complete Section D of the Form (RCRO).pdf 7-3 Upload Approved-Denied CDOT Form 1337 into LCPtracker (RCRO).pdf 7-4 Complete Form 838 and Submit to PE_PM (Prime Contractor).pdf 7-11 Review and Approve_Deny of CDOT Form 832 (PE_PM).pdf Previous 20 items 1 2 3 4 5 6 Next 20 items
3-7 Review Submitted Utilization Plan and Associated Form(s) 1415 and Form 1416 (if needed) (CRBRC).pdf
8-2 Determine if Firm will be Performing as a Subcontractor (Form 205) or Supplier (Form 1425) (Prime Contractor).pdf