You are here: Home Projects Archived Project Sites US 24 Curve Correction in Teller County Photo Gallery Photo Gallery https://www.codot.gov/projects/archived-project-sites/us24curvecorrection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Wide view excavation underway with traffic shift in place 5 31 23.jpg Excavation underway of north slope rock at the curve on US 24 - 5 31 23.jpg Closeup rock chipping 5 31 23.jpg Closeup excavation equipment removing rock from the north slope on US 24 - 5 31 23.jpg Close up north slope rock excavation operations 5 31 23 .jpg Wide view rock removal underway US 24 at MP 272 resized Tessa Lane.jpg Wide View rock removal operations US 24 site of the curve July 10 Photo Tessa Lane resized.jpg Heavy equipment clearing US 24 after rock removal operation Photo Tessa Lane cropped and resized.jpg Closeup loader clearing US 24 after rock removal operation Tessa Lane resized.jpg Wide view crews clearing and shouldering for road base Photo Monica Ramey.jpg Crews preparing shoulder area for upcoming paving Photo Monica Ramey (1).jpg Flaggers managing traffic flows on US 24 east of Florissant Photo Monica Ramey.jpg Crews applying road base during single lane closure along US 24 Photo Monica Ramey.jpg Wide view of finished curve correction and newly paved secton of US 24. Photo Tessa Lane..jpg resized.jpg View of newly aligned curve on US 24 near Florissant. Photo Tessa Lane.jpg resized.jpg Crews finishing guardrail installation on US 24 at the curve. Photo Tessa Lane..jpg resized.jpg Area of newly aligned paved and striped curve and north slope rock excavation on US 24. Photo Tessa Lane..jpg resized.jpg
Photo Gallery https://www.codot.gov/projects/archived-project-sites/us24curvecorrection/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Photo Gallery Wide view excavation underway with traffic shift in place 5 31 23.jpg Excavation underway of north slope rock at the curve on US 24 - 5 31 23.jpg Closeup rock chipping 5 31 23.jpg Closeup excavation equipment removing rock from the north slope on US 24 - 5 31 23.jpg Close up north slope rock excavation operations 5 31 23 .jpg Wide view rock removal underway US 24 at MP 272 resized Tessa Lane.jpg Wide View rock removal operations US 24 site of the curve July 10 Photo Tessa Lane resized.jpg Heavy equipment clearing US 24 after rock removal operation Photo Tessa Lane cropped and resized.jpg Closeup loader clearing US 24 after rock removal operation Tessa Lane resized.jpg Wide view crews clearing and shouldering for road base Photo Monica Ramey.jpg Crews preparing shoulder area for upcoming paving Photo Monica Ramey (1).jpg Flaggers managing traffic flows on US 24 east of Florissant Photo Monica Ramey.jpg Crews applying road base during single lane closure along US 24 Photo Monica Ramey.jpg Wide view of finished curve correction and newly paved secton of US 24. Photo Tessa Lane..jpg resized.jpg View of newly aligned curve on US 24 near Florissant. Photo Tessa Lane.jpg resized.jpg Crews finishing guardrail installation on US 24 at the curve. Photo Tessa Lane..jpg resized.jpg Area of newly aligned paved and striped curve and north slope rock excavation on US 24. Photo Tessa Lane..jpg resized.jpg
Wide view of finished curve correction and newly paved secton of US 24. Photo Tessa Lane..jpg resized.jpg
Area of newly aligned paved and striped curve and north slope rock excavation on US 24. Photo Tessa Lane..jpg resized.jpg