Bicycle and Pedestrian Facilities
2015-09. November 5, 2015. Chapter 14 "Bicycle and Pedestrian Facilities" of the CDOT Roadway Design Guide has been revised.
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
PS&E Revisions Under Ad Process Instructions
2015-8. October 9. 2015. To provide consistency and uniformity to the Revision Under Advertisement process, significant details have been added to Section 2.34 ...
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
PS&E Package to FHWA
2015-7. Revised on October 9, 2015. In order to not delay going to ad, the PS&E (Plans, Specifications and Estimate) Package for projects of Division Interest ...
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Materials for Noise Barrier Walls
2015-6. August 17, 2015. Chapter 18 Noise Guide of the CDOT Roadway Design Guide has been revised and expanded to present more detailed information about the ...
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Tracking Permanent Water Quality Mitigation Pool Money
2015-5. August 17, 2015. The purpose of this bulletin is to provide direction on tracking Permanent Water Quality (PWQ) project money. A project follows this ...
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Soil Retention Coverings
2014-8. July 8, 2014. Superseded on July 24, 2015. This design bulletin replaces the guidance in the Erosion Control and Stormwater Quality Guide, Chapter 5, ...
Located in
Business Center
/
…
/
Design Bulletins
/
Superseded Design Bulletins
-
Policy on Context Sensitive Solutions
2015-4. June 8, 2015. Policy Memo 26 Context Sensitive Solutions (CSS) Vision for CDOT, issued October 31, 2005 has been replaced by a new subsection of ...
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Policy on Ensuring Bidding Competition
2015-3. May 4, 2015 (Revised on May 29, 2015 with correct the Transport coding). Information on Cut Back and Multiple Schedule Projects.
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Policy on Warranty Provisions
2015-2. May 4, 2015. Information about Special Provisions.
Located in
Business Center
/
…
/
Bulletins and Manuals
/
Design Bulletins
-
Reducing Construction Duration and Minimizing User Impacts and Delays
2015-1. January 22, 2015. This design bulletin is intended to ensure that every CDOT project gives appropriate consideration to the use of innovative ...