You are here: Home Projects Archived Project Sites US 385 Holyoke North Resurfacing Project Photos Project Photos https://www.codot.gov/projects/archived-project-sites/us385-holyoke-resurfacing/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Project Photos Stripping topsoil and bringing in fill US 385 north of Holyoke photo Doug Stumpf.jpg Removal of existing ADA ramp - US 385 Holyoke Photo Doug Stumpf.jpg Pouring back new ADA ramp in Holyoke - US 385 Holyoke - photo Doug Stumpf.jpg Finished ADA ramps and curbs at US 385 and Jules Holyoke Photo Ileana Rico.jpg Crews pouring concrete new ADA ramps US 385 Holyoke Photo Ileana Rico.jpg Concrete pour June 15 US 385 at Jules Holyoke Photo Ileana Rico.jpg Close up crews pouring new sidewalk and ramps US 385 Holyoke Photo Ileana Rico.jpg Shoulder milling US 385 to prepare for new shoulders Photo Doug Stumpf.jpg Crews milling shoulders along US 385 north of Holyoke Photo Doug Stumpf.jpg Shouldering underway on US 385 north of Holyoke Photo Doug Stumpf.jpg Crews working on shoulder widening and stabilization US 385 Holyoke Photo Doug Stumpf.jpg Crews milling sections of US 385 north of Holyoke. Photo Ileana Rico.jpg Closeup new colored concrete and curb ramps in Holyoke. Photo Ileana Rico.jpg Closeup milling operations on US 385 north of Holyoke. Photo Ileana Rico.jpg crews paving US 385 in town Ileana Rico.jpg resized.jpg crews asphalt paving US 385 within the town limits Ileana Rico.jpg resized.jpg Paving underway US 385 by the railroad tracks Photo Ileana Rico.jpg Paving operations underway US 385 at Carnahan Photo Ileana Rico.jpg
Project Photos https://www.codot.gov/projects/archived-project-sites/us385-holyoke-resurfacing/photo-gallery https://www.codot.gov/@@site-logo/siteLogo.png Project Photos Stripping topsoil and bringing in fill US 385 north of Holyoke photo Doug Stumpf.jpg Removal of existing ADA ramp - US 385 Holyoke Photo Doug Stumpf.jpg Pouring back new ADA ramp in Holyoke - US 385 Holyoke - photo Doug Stumpf.jpg Finished ADA ramps and curbs at US 385 and Jules Holyoke Photo Ileana Rico.jpg Crews pouring concrete new ADA ramps US 385 Holyoke Photo Ileana Rico.jpg Concrete pour June 15 US 385 at Jules Holyoke Photo Ileana Rico.jpg Close up crews pouring new sidewalk and ramps US 385 Holyoke Photo Ileana Rico.jpg Shoulder milling US 385 to prepare for new shoulders Photo Doug Stumpf.jpg Crews milling shoulders along US 385 north of Holyoke Photo Doug Stumpf.jpg Shouldering underway on US 385 north of Holyoke Photo Doug Stumpf.jpg Crews working on shoulder widening and stabilization US 385 Holyoke Photo Doug Stumpf.jpg Crews milling sections of US 385 north of Holyoke. Photo Ileana Rico.jpg Closeup new colored concrete and curb ramps in Holyoke. Photo Ileana Rico.jpg Closeup milling operations on US 385 north of Holyoke. Photo Ileana Rico.jpg crews paving US 385 in town Ileana Rico.jpg resized.jpg crews asphalt paving US 385 within the town limits Ileana Rico.jpg resized.jpg Paving underway US 385 by the railroad tracks Photo Ileana Rico.jpg Paving operations underway US 385 at Carnahan Photo Ileana Rico.jpg