Segment C is located between US 287 and 119th Street. CO 7 is constrained through this area, and a study is underway to identify improvements to Arapahoe Road (from US 287 to 119th Street) and 119th Street (from Arapahoe Road to CO 7/Baseline Road) to help handle the east-west multimodal travel needs of the corridor.

About the Study
This study will provide recommendations to improve the travel experience and connect communities from Boulder to east of Lafayette in the future.
The Colorado Department of Transportation, Boulder County, The City of Lafayette, and the Town of Erie have completed several corridor studies and planning efforts for CO 7 in the last decade. These studies all have a direct influence on this project. This project will use public input and data from those studies to inform and guide the process.
Engage with the project:
February 2023: Survey Closed
A summary of public responses is coming soon! Thank you for your participation.
April- May 2023: Online and in community
Concept ideas were presented in an online map and at the Erie Earth Day event.
June 2023: Project Page Updates
Review recommended solutions and next steps.