I-70 Floyd Hill Design Rendering 2.jpg
Design rendering of the new I-70 Floyd Hill Project highway alignment, facing south. Pictured from top to bottom: westbound I-70, eastbound I-70 and the new US 6 frontage road that connects to the Hidden Valley/Central City Parkway (Exit 243) interchange.
https://www.codot.gov/projects/i70floydhill/photos/i-70-floyd-hill-design-renderings/fh-rendering-2.jpg/view
https://www.codot.gov/projects/i70floydhill/photos/i-70-floyd-hill-design-renderings/fh-rendering-2.jpg/@@download/image/FH Rendering 2.jpg
I-70 Floyd Hill Design Rendering 2.jpg
Design rendering of the new I-70 Floyd Hill Project highway alignment, facing south. Pictured from top to bottom: westbound I-70, eastbound I-70 and the new US 6 frontage road that connects to the Hidden Valley/Central City Parkway (Exit 243) interchange.