Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Floyd Hill
  4. Photo Gallery
Quick Links
  • The Live Lift
  • Rock Scaling & Blasting Frequently Asked Questions
  • Anticipated Traffic Impacts
  • Clear Creek Greenway Trail
  • Air Quality Information
  • Accountability Dashboards
  • Early Projects
  • Environmental Protections During Construction
  • Documents & Records

Photo Gallery https://www.codot.gov/projects/i70floydhill/photos https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Work zone with a sign saying trucks entering/exiting. thumbnail image July 2023 Photos (5)
Crews working on soil nails | Alt text: People installing construction equipment on a hill wall. thumbnail image August 2023 Photos (5)
Construction crews spraying concrete on side of hill. thumbnail image October 2023 Photos (5)
Crews completing environmental mitigation in the Central Section of the project thumbnail image November 2023 (5)
Installation of gabion baskets thumbnail image September 2023 (5)
Two construction workers digging around drainage pipe. thumbnail image December 2023 Photos (4)
Road sign with blowing snow and bright sun. thumbnail image January 2024 Photos (8)
240224_Construction equipment moving rocks_I-70 Floyd Hill.jpg thumbnail image February 2024 Photos (5)
240311_Water quality pond_I-70 Floyd Hill.jpg thumbnail image March 2024 Photos (8)
I-70 Floyd Hill East Section Construction Zone.jpg thumbnail image April 2024 Photos (8)
I-70 Floyd Hill Deer Fence Installion Image 2.jpg thumbnail image May 2024 (5)
I-70 Floyd Hill Crews in Front of American Flag.JPG thumbnail image June 2024 (8)
I-70 Floyd Hill US-40 Run Down Pipe.jpg thumbnail image July 2024 (7)
I-70 Floyd Hill Deer Guard Pour Before Backfill.jpg thumbnail image August 2024 (7)
I-70 Floyd Hill Rock Staircase that Assists with Drainage on the Project.jpg thumbnail image September 2024 (7)
I-70 Floyd Hill Drill Rig 10212024.jpg thumbnail image October 2024 (6)
Animal crossing I-70 Floyd Hill Project thumbnail image November 2024 (6)
I-70 Floyd Hill Saddle Cut 12202024.jpeg thumbnail image December 2024 (5)
I-70 Floyd Hill Wire Mesh 01222025.jpg thumbnail image January 2025 (6)
I-70 Floyd Hill Hill Side Access CP3 02012025.jpg thumbnail image February 2025 (6)
I-70 Floyd Hill Drilling Operations 03222025.jpg thumbnail image March 2025 (6)
Rendering of the completed I-70 Floyd Hill Project I-70 alignment looking south, with westbound I-70 braiding over eastbound I-70 at the bottom of Floyd Hill. thumbnail image I-70 Floyd Hill Design Renderings (2)
I-70 Floyd Hill Clear Creek Revetment Snow 04012025.jpg thumbnail image April 2025 (6)
I-70 Floyd Hill Project Excavation US 6 Offramp - May 1, 2025.jpg thumbnail image May 2025 (6)
I-70 Floyd Hill Project West Rock Cut 06182025.jpg thumbnail image June 2025 (7)
I-70 Floyd Hill West Cut Access 07302025.jpg thumbnail image July 2025 Photos (7)
Rock Scaling Above on I-70 Floyd Hill on Aug. 14, 2025.jpg thumbnail image August 2025 (6)
Two rafts in Clear Creek floating down the river under a bridge with dark clouds above. thumbnail image September 2025 Photos (6)
I-70 Floyd Hill - Pier 15 Construction - Oct. 22, 2025.jpg thumbnail image October 2025 Photos (6)
I-70 Floyd Hill Column Pour Pier 17 - Nov. 26, 2025.jpg thumbnail image November 2025 Photos (6)
I-70 Floyd Hill Pier 17 at Central City - Dec. 8, 2025.jpg thumbnail image December 2025 (6)
I-70 Floyd Hill Crane Rebar - Jan. 22, 2026.jpg thumbnail image January 2026 (6)
I-70 Floyd Hill CP2 Drainage Feb. 10, 2026.jpg thumbnail image February 2026 (10)
I-70 Floyd Hill Excavator Work Zone - March 19, 2026.jpg thumbnail image March 2026 (8)
I-70 Floyd Hill Package 4 Narrows - April 20, 2026.jpg thumbnail image April 2026 (6)
I-70 Floyd Hill Team Meeting - May 30, 2026.jpg thumbnail image May 2026 (10)
An orange concrete pump truck extends its long boom over a bridge deck under construction. The site is located in a mountain canyon next to a multi-lane highway with a green exit sign for Hidden Valley and Central City. thumbnail image June 2026 (9)

I-70 Floyd Hill logo

Contact Us

Phone:
720-994-2368

Email: 
[email protected]

Sign Up for Project Updates

Sign Up for I-70 Floyd Hill Project Updates

Sign up for text alerts:
Text ‘floydhill’ to 21000

Resources
  • Project Fact Sheet
  • Detalles del Proyecto
  • I-70 Floyd Hill CM/GC Approval Memo (July 23, 2020)
  • I-70 Floyd Hill Construction Manager Authorization Memo (Jan. 28, 2022)
  • Backseat Bingo in English
  • Lotería de la construcción en español

I-70 Floyd Hill Photos

I-70 Floyd Hill Project Newsletter
  • I-70 Floyd Hill Project Update Week of July 19, 2026
  • I-70 Floyd Hill Project Update Week of July 12, 2026
  • I-70 Floyd Hill Project Update Week of July 5, 2026
  • I-70 Floyd Hill Project Update Week of June 28, 2026
  • I-70 Floyd Hill Project Update Week of June 21, 2026
I-70 Floyd Hill Project Newsletter - More…
Stay Informed

Sign up for project updates by clicking the link below:

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo