Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. I-70 Floyd Hill
  4. Photo Gallery
Quick Links
  • The Live Lift
  • Anticipated Traffic Impacts
  • Clear Creek Greenway Trail
  • Air Quality Information
  • Accountability Dashboards
  • Early Projects
  • Environmental Protections During Construction
  • Documents & Records
  • Frequently Asked Questions

Photo Gallery https://www.codot.gov/projects/i70floydhill/photos https://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Work zone with a sign saying trucks entering/exiting. thumbnail image July 2023 Photos (5)
Pond grading with 40-ton haul truck and cat excavator | Alt text: Heavy machinery moving dirt. thumbnail image August 2023 Photos (5)
Construction crews spraying concrete on side of hill. thumbnail image October 2023 Photos (5)
Crews completing environmental mitigation in the Central Section of the project thumbnail image November 2023 (5)
Construction equipment breaking rock thumbnail image September 2023 (5)
Two construction workers digging around drainage pipe. thumbnail image December 2023 Photos (4)
Construction crews installing rebar on wall. thumbnail image January 2024 Photos (8)
240224_Construction equipment moving rocks_I-70 Floyd Hill.jpg thumbnail image February 2024 Photos (5)
240321_Kraemer crew installing new Double Erosion Protection Caps on the soil nails_I-70 Floyd Hill.jpg thumbnail image March 2024 Photos (8)
I-70 Floyd Hill April Safety Meeting.JPG thumbnail image April 2024 Photos (8)
I-70 Floyd Hill Deer Fence Installion Image 2.jpg thumbnail image May 2024 (5)
I-70 Floyd Hill Work on Temporary Bridge Structure.JPG thumbnail image June 2024 (8)
I-70 Floyd Hill Crews Installing Slip Barrier.jpg thumbnail image July 2024 (7)
I-70 Floyd Hill Temporary Bridge Deck Pour.jpg thumbnail image August 2024 (7)
I-70 Floyd Hill Rock Staircase that Assists with Drainage on the Project.jpg thumbnail image September 2024 (7)
I-70 Floyd Hill Top of Saddle Cut 10162024.jpg thumbnail image October 2024 (6)
Concrete pour slope paving I-70 Floyd Hill Project thumbnail image November 2024 (6)
I-70 Floyd Hill Project Saddle Cut Excavation 12202024.jpeg thumbnail image December 2024 (5)
I-70 Floyd Hill Hillside Block Wall US 40 01142025.jpg thumbnail image January 2025 (6)
I-70 Floyd Hill SaddleCutTrucking 02122025.jpg thumbnail image February 2025 (6)
I-70 Floyd Hill Wall median 03062025.jpg thumbnail image March 2025 (6)
Design rendering of the new I-70 Floyd Hill Project highway alignment, facing south. Pictured from top to bottom: westbound I-70, eastbound I-70 and the new US 6 frontage road that connects to the Hidden Valley/Central City Parkway (Exit 243) interchange. thumbnail image I-70 Floyd Hill Design Renderings (2)
I-70 Floyd Hill Barrier Install 04172025.jpg thumbnail image April 2025 (6)
I-70 Floyd Hill Project Post Blast Work - May 28, 2025.jpg thumbnail image May 2025 (6)
I-70 Floyd Hill Project West Rock Cut 06182025.jpg thumbnail image June 2025 (7)
I-70 Floyd Hill Drilling Operations 07252025.jpg thumbnail image July 2025 Photos (7)
Column Pour on I-70 Floyd Hill - Aug. 8, 2025.jpg thumbnail image August 2025 (6)
Crews pouring concrete at a bridge pier using a cement truck and large construction equipment with Clear Creek in the background. thumbnail image September 2025 Photos (6)
I-70 Floyd Hill - Pier 15 Construction - Oct. 22, 2025.jpg thumbnail image October 2025 Photos (6)
I-70 Floyd Hill Pier 15 Excavation - Nov. 24, 2025.jpg thumbnail image November 2025 Photos (6)
I-70 Floyd Hill Central Bridge Work - Dec. 17, 2025.jpg thumbnail image December 2025 (6)
I-70 Floyd Hill Crane Rebar - Jan. 22, 2026.jpg thumbnail image January 2026 (6)
I-70 Floyd Hill CP2 Drainage Feb. 10, 2026.jpg thumbnail image February 2026 (10)
I-70 Floyd Hill Wide Pier17 - March 26, 2026.jpg thumbnail image March 2026 (8)
I-70 Floyd Hill Bridge X - April 28, 2026.jpg thumbnail image April 2026 (6)
I-70 Floyd Hill Pier 14 Casson Construction - May 31, 2026.jpg thumbnail image May 2026 (10)
A large concrete bridge pier under construction in a mountain canyon. A white mobile crane and a tall blue lattice boom crane stand next to the pier. An interstate highway runs along the canyon floor to the left. thumbnail image June 2026 (9)

I-70 Floyd Hill logo

Contact Us

Phone:
720-994-2368

Email: 
[email protected]

Sign Up for Project Updates

Sign Up for I-70 Floyd Hill Project Updates

Sign up for text alerts:
Text ‘floydhill’ to 21000

Resources
  • Project Fact Sheet
  • Detalles del Proyecto
  • I-70 Floyd Hill CM/GC Approval Memo (July 23, 2020)
  • I-70 Floyd Hill Construction Manager Authorization Memo (Jan. 28, 2022)
  • Backseat Bingo in English
  • Lotería de la construcción en español

I-70 Floyd Hill Photos

I-70 Floyd Hill Project Newsletter
  • I-70 Floyd Hill Project Update Week of Aug. 23, 2026
  • I-70 Floyd Hill Project Update - I-70 Closures Update Aug. 18, 2026
  • I-70 Floyd Hill Project Update Week of Aug. 16, 2026
  • I-70 Floyd Hill Project Update Week of Aug. 9, 2026
  • I-70 Floyd Hill Project Update Week of Aug. 2, 2026
I-70 Floyd Hill Project Newsletter - More…
Stay Informed

Sign up for project updates by clicking the link below:

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo