View of bridge construction on the upper hillside adjacent to current I-70 travel lanes and above US 40.
October 2026
View of new bridge columns adjacent to current I-70 travel lanes which will carry westbound I-70 in its new alignment.
View of Pier 17 being built out over I-70 traffic, as part of segmental bridge construction.
View of Pier 17 and 18 bridge construction, which are part of the concrete cast-in-place segmental bridge.
I-70 Floyd Hill construction of retaining walls adjacent to current I-70 that will be the future westbound I-70 off-ramp to US 6.
I-70 Floyd Hill bridge pier construction on the hillside adjacent to I-70 above US 40.
Overhead view of a concrete pour and truck near US 6 for segmental bridge construction.