September 2025
Crews pouring concrete at a bridge pier using a cement truck and large construction equipment with Clear Creek in the background.
An excavator moving rock and dirt on the side of I-70.
A red crane at Pier 17 while crews are working with I-70 and a mountain with trees in the background.
Two rafts in Clear Creek floating down the river under a bridge with dark clouds above.
Package 2 building causeway on top of the river under Bridge D.