Traffic Impacts
Construction Activities & Impacts
Work for the week of Nov. 29
The speed limit on the project has been lowered to 65 mph. Please obey speed limit signs.
Lane closures for the week of Nov. 29:
- Monday through Friday: Full closure of I-25 E. Frontage Road between WCR 38 and 40.
- Monday through Friday: I-25 E. Frontage Road between WCR 36 and GWRR reduced to one alternating lane.
- Tuesday: Brief traffic stops with flaggers on the northbound I-25 on-ramp at WCR 34.
- Ongoing: Full closure of I-25 E. Frontage Road access to WCR 34.
Monday at 7 a.m., through Friday at 5 p.m., the I-25 E. Frontage Road will be closed between Weld County Road 38 and Weld County Road 40 for paving and guardrail repairs.
- Detours:
- Northbound traffic will turn east at WCR 38, turn north at Colorado Boulevard, turn west at WCR 40 and continue to the I-25 E. Frontage Road.
- Southbound traffic will turn east at WCR 40, turn south at Colorado Boulevard, turn west at WCR 38 and continue to the I-25 E. Frontage Road.

Monday through Friday, 7:30 a.m. to 5 p.m., the I-25 E. Frontage Road between Weld County Road 36 and the Great Western railroad crossing will be reduced to one alternating lane controlled by flaggers to allow crews to place erosion control material.
Tuesday, Dec. 1, 7:30 a.m. to sunset, there will be brief traffic stops controlled by flaggers on the northbound I-25 on-ramp at Weld County Road 34 for concrete grinding. Plan for minor delays.
Wednesday, Dec. 9, 9 p.m. to 5 a.m., the northbound I-25 off-ramp at Weld County Road 34 will be temporarily closed to remove barriers. A detour will be in place:
- Traffic will continue north to Colorado Highway 56 (exit 250), turn around and travel south to exit 245.
There are no traffic impacts planned.
I-25 E. Frontage Road Access Impacts
The I-25 E. Frontage Road is temporarily closed to thru traffic between Weld County Road 32 and Colorado Highway 56 to prepare for the I-25 northbound lane widening and the frontage roadway transition. Crews have reduced the asphalt roadway width on isolated sections of the frontage road. Viable detour routes and speed limit reductions will be posted. Please drive carefully through the work zones and reduced roadway sections. Motorists may use alternate north/south roadways such as Weld County Road 9.5, Weld County Road 7 and Colorado Boulevard. Drivers can also use High Plains Boulevard between Weld County Road 32 and WCR 36 as an alternate route.
CDOT changed I-25 E. Frontage Road thru access north of WCR 34, near Mead, in January. Closing frontage road access to WCR 34 is required for crews to extend the North Creek Box Culvert as part of the I-25 North Express Lanes Project. This access change was coordinated with the Town of Mead and Weld County, who built a 2-mile portion of High Plains Boulevard between WCR 32 and WCR 36.
Thru traffic that previously used the frontage road can now use High Plains Boulevard, and the frontage road is now limited to private property and utility access only. As shown on the map, local motorists will be able to access their properties between WCR 34 and WCR 36 but thru traffic will not be allowed.
CDOT is now issuing $75 fines for speeding in the I-25 North work zone between Mead and Berthoud. Civil penalties began April 2, 2026, following a 30-day grace period during which speeding drivers were given warning notices.
Since the start of the program, excessive speeding in the I-25 North work zone has decreased by 93%. The Colorado Speed Enforcement Program aims to reduce excessive speeding in vulnerable areas such as work zones and school zones, which is a frequent cause of traffic crashes and fatalities in Colorado. For more information about the program, please visit codot.gov/programs/speedenforcement.
Approximately one mile of the southbound I-25 Express Lane, between mile points 251 and 250, from approximately Weld County Road 44 to WCR 46, is closed through late 2027.

The I-25 North Express Lanes from Berthoud to Fort Collins are actively tolling. The Safety and Toll Enforcement Program will go into effect May 7, following the 30-day warning period.
Sophisticated roadside technology is used to enforce traffic violations. To avoid unnecessary fines, remember the following Express Lane rules:
- Do not weave across the solid white lines (tickets for violations start at $75 each).
- Enter and exit the Express Lanes through the dashed lines only.
- Obey posted speed limits. The Express Lanes cannot be used to pass slower moving vehicles.
For future project updates and information, please check the Express Lanes website and COTrip.org.