Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Business
You are here:
  1. Home
  2. Business Center
  3. Design & Construction Project Support
  4. Construction Specifications
  5. 2023 Construction Specifications
  6. Sample Construction Project Special Provisions
  7. Revisions to Sections 100 and 200
Revisions to Sections 100 and 200 https://www.codot.gov/business/designsupport/cdot-construction-specifications/2023-construction-specifications/sample-construction-project-special-provisions/sections-100-200-revisions https://www.codot.gov/@@site-logo/siteLogo.png

Revisions to Sections 100 and 200

REVISION OF SECTION 105 - PORTLAND CEMENT CONCRETE PAVEMENT GRINDING
REVISION OF SECTIONS 105, 106, AND 203 - CONFORMITY TO THE CONTRACT OF EMBANKMENT
REVISION OF SECTIONS 105 - CONTROL OF WORK, 106 - CONTROL OF MATERIAL, and 401 - PLANT MIX PAVEMENTS–GENERAL
REVISIONS OF SECTIONS 105 AND 608 - DETECTABLE WARNINGS
REVISION OF SECTION 202 - REMOVAL OF ASPHALT MAT
REVISION OF SECTION 202 - REMOVAL AND TRIMMING OF TREES
REVISION OF SECTION 207 - TOPSOIL
REVISION OF SECTION 208 - CONSTRUCTION MATS
REVISION OF SECTION 208 - SURVEY OF CONTROL MEASURES
REVISION OF SECTION 210 - MODIFY OR RESET PEDESTRIAN PUSH BUTTON
REVISION OF SECTION 210 - REPAIR CURB RAMPS AND SIDEWALK
REVISION OF SECTION 211 - IN-SITU SOIL STABILIZATION
REVISION OF SECTION 213 - MULCHING (DECORATIVE)

Tags:
  • Construction Specifications
Contact Us

CDOT Project Support 
[email protected]
If you are a CDOT employee, consultant, or contractor and would like to receive emails about the latest updates and revisions to these websites, please email us using the email above. Include your name, company name, and the email address that you would like to receive this information.


Bill Cornelius, P.E.
State Standards and Specifications Engineer
Unit Manager
[email protected]

Michele Kayen, P.E.
Specifications Engineer
[email protected]

David Kosmiski, P.E.
M Standards Engineer
[email protected]

Amin Fakhimalizad
Assistant M Standards Engineer
[email protected]

Vacant
Process and Innovation Engineer

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo