Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. US 287/120th Broomfield Multi-Modal Study
  5. Fact Sheets
Resources
  • Projects
  • Assets
  • Studies
    • US 24 West Finding of No Significant Impact (FONSI)
    • North I-25 PEL Study, US 36 to CO 7
    • US 34 & US 85 Interchange PEL Study
    • I-25 and Arapahoe Road/SH 88 Interchange Environmental Assessment & FONSI
    • I-25 Colorado Springs Area Finding of No Significant Impact (FONSI)
    • CO 7 Cherryvale to 75th Street EA & FONSI
    • US 34, US 287 to Larimer County Rd. 3 EA and FONSI
    • US 36 Managed Lanes - Investment Grade Traffic and Revenue Study
    • South I-25 Corridor and US 85 Corridor FEIS & ROD
    • US 6 - 24 Road to SH 139 Access Control Plan
    • US 6/River Front Road Access Control Plan in Silt
    • 2009 Disparity Study and Appendices
    • I-25 Valley Highway Environmental Impact Statement (EIS) and ROD
    • I-25, Colorado Springs to Monument Environmental Assessment
    • SH 42 Planning and Environmental Linkage Study (PEL)
    • US 40 Section 4(f) Evaluation
    • US 50 West Wills Blvd to McCulloch Blvd EA
    • US 50 West PEL Study
    • SH 60 Access Control Plan
    • SH 60 Environmental Overview Study
    • I-70/32nd Avenue Interchange Environmental Assessment
    • I-70 Mountain Corridor Mobility and Operational Assessment
    • I-70 Mountain Corridor Short Term Mobility Solutions Report
    • I-70 Reversible Lane Study
    • I-70 Reversible (Zipper) Lane Study Phase II
    • I-70 Twin Tunnels Environmental Assessment
    • SH 88/Federal Boulevard Environmental Assessment and FONSI
    • SH 133 Carbondale Access Control Plan
    • US 160 Durango to Bayfield Final EIS
    • US 160 Durango to Bayfield ROD October 2006
    • US 285 Environmental Assessment with Appendices
    • US 287 at Lamar Environmental Assessment and FONSI
    • US 287 Loveland to Fort Collins Environmental Overview Study (EOS)
    • US 287 from CO 1 to the LaPorte Bypass EA and FONSI
    • US 385 High Plains Corridor
    • SH 402 EA and FONSI
    • C-470 Environmental Assessment & FONSI 2015
    • Denver Area Regional Bus Facility Study
    • Devolution Study Report
    • Eastern Colorado Mobility Study
    • Northwest Corridor EIS
    • Ports to Plains
    • Region 3 Intersection Priority
    • Studies & Assessments
    • CO 119 Multi-modal Planning and Environmental Linkages Study
    • I-270 Corridor Improvements Study
    • US 287/120th Broomfield Multi-Modal Study
      • Goals and Objectives
      • Public Outreach
      • Fact Sheets
        • us-287-120th-ave-multimodal-study-fact-sheet-english-1.pdf
        • US 287 120th Ave Multimodal Study Fact Sheet ENGLISH (1).pdf
        • US 287 120th Ave Multimodal Study Final HMONG.pdf
        • US 287 120th Ave Multimodal Study Fact Sheet HMONG.pdf
        • US 287 120th Ave Multimodal Study Fact Sheet Vietnamese (1).pdf
        • US 287 120th Ave FAQs Chinese v2.pdf
        • US 287 120th Ave Fact Sheet Chinese v2.pdf
        • US 287 120th Ave Multimodal Study FAQ Vietnamese.pdf
        • US 287 120th Ave Multimodal Study Fact Sheet Vietnamese.pdf
        • US 287 120th Avenida Estudio Multimodal Preguntas frecuentes Espanola.pdf
        • US 287 120th Avenida Estudio Multimodal Hoja de hechos Espanola.pdf
        • US 287 120th Ave Multimodal Study ENGLISH (2).pdf
      • Fact Sheets
  • Region 1 Denver Metro/Central Colorado Projects
  • Region 2 Southeastern Colorado Projects
  • Region 3 Northwestern Colorado Projects
  • Region 4 Northeastern Colorado Projects
  • Region 5 Southwestern Colorado Projects
  • Central 70
  • I-25 (US 36 to 104th Ave) Improvements
  • Santa Fe Drive Action Plan- A Planning & Environmental Linkages (PEL) Study | C-470 to I-25
  • Southeastern Colorado Bridge Bundle Project
  • CO 82 - Paepcke Transit Hub Improvements in the City of Aspen on Main and Galena
  • Eisenhower-Johnson Memorial Tunnels Infrastructure Repairs
  • CO 115 Improvements - Colorado Springs to Penrose
  • US 85 Corridor Improvements
  • I-70 VSL and CO 74 & US 285 ITS Upgrades
  • I-25 and CO-7: Interim Transit Improvements
  • CO 119 Boulder Canyon Tunnel Repairs
  • C-470 Trail Bridge over Acres Green
  • I-25 & Alameda Bridge Replacement
  • I-70 Bridges over Ward Road
  • I-25 Walsenburg Bridge Replacement
  • Firestone-Longmont Mobility Hub
  • CO 207 & CO 266 Resurfacing
  • CO 109 Bridge over US 50, BNSF Railroad
  • US 24 Woodland Park Paving and ADA Curb Ramp Improvements
  • CO 172 Ignacio Resurfacing
  • US 385 Holyoke North Resurfacing
  • Drew Dix Parkway Dillon Drive at I-25 Interchange
  • Metro Denver Bridge Deck Safety Project
  • I-70 Bridge Maintenance between Limon and Agate
  • US 6 & 20 Road Intersection Improvements
  • CO 64 Bridges west of Meeker
  • US 160 Priority Culverts in Southwestern Colorado
  • CO 318 Resurfacing Project Moffat County
  • US 285/CO 9 Intersection Improvements & Bridge Replacement
  • US 160 Cortez Signal Improvements
  • CO 96 Overlay between Eads and Sheridan Lake
  • CO 2/CO 88/US 285 Denver Metro ADA Ramps
  • US 160 Pagosa West Resurfacing
  • US 36 Surface and Safety Improvements between Boulder and Lyons
  • I-70 Bridge Over Washington Street
  • CO 71 Passing Lane Construction from Limon to Brush
  • CO 138 Logan County Widening Project
  • CDOT Retaining Wall Improvements in Jefferson County
  • CO 133 Culvert Repair in Bowie, CO
  • Preventative Maintenance of I-25 bridges at 58th and 62nd
  • CO 71 Overlay between Ordway and Punkin Center
  • Eastbound I-70 Mount Vernon Truck Escape Ramp Reconstruction
  • US 550 Avalanche Control System
  • CO 96 Pueblo Intersection Project
  • US 34 - Signal Pole Replacement in Brush, Akron, Otis and Wray
  • I-76 Cable Rail Project Ft. Morgan to Brush
  • CO 133 Paonia Slope Stabilization
  • I-70 Eastbound Resurfacing in Clear Creek County
  • CO 194 Improvements between La Junta and Las Animas in Bent County
  • I-70 Picadilly Design-Build Project (City of Aurora Project)
  • CO 151 Emergency Culvert north of Arboles
  • CO 66 Intersection Improvements in Northeastern Colorado/Region 4
  • I-25 Concrete Panel Replacement from Fort Collins to Owl Canyon Road
  • I-270 Bridge Preventative Maintenance
  • CO 88/Belleview Traffic Safety Project
  • Southeast Colorado Sign Replacement (12 locations)
  • US 34 CCTV Weather Cameras from Greeley to Wiggins
  • US 24 Intersection Improvements Southwest of Manitou Springs
  • I-25 Acceleration/Deceleration Lanes Fillmore Street to Garden of the Gods Road
  • CO 392 Weld County Safety Project
  • US 50B Drainage Improvements east of Swink
Fact Sheets https://www.codot.gov/projects/studies/us287-120th-multi-modal-study/fact-sheets https://www.codot.gov/@@site-logo/siteLogo.png

Fact Sheets

us-287-120th-ave-multimodal-study-fact-sheet-english-1.pdf
US 287 120th Ave Multimodal Study Fact Sheet ENGLISH (1).pdf
US 287 120th Ave Multimodal Study Final HMONG.pdf
US 287 120th Ave Multimodal Study Fact Sheet HMONG.pdf
US 287 120th Ave Multimodal Study Fact Sheet Vietnamese (1).pdf
US 287 120th Ave FAQs Chinese v2.pdf
US 287 120th Ave Fact Sheet Chinese v2.pdf
US 287 120th Ave Multimodal Study FAQ Vietnamese.pdf
US 287 120th Ave Multimodal Study Fact Sheet Vietnamese.pdf
US 287 120th Avenida Estudio Multimodal Preguntas frecuentes Espanola.pdf
US 287 120th Avenida Estudio Multimodal Hoja de hechos Espanola.pdf
US 287 120th Ave Multimodal Study ENGLISH (2).pdf

Surveys

Provide Input

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo